Industrial Small Tunnel dryer for Hollow Brick Making Plant
USD $100,000 - $200,000 /Set
Min.Order:1 Set
Xian Brictec Engineering Co., Ltd.
There are 3types of dryer :1) Small dryer 2)chamber dryer 3)Tunnel dryer
Dryer type | Brick setting times | Material option | Product standard | Auto-Level | Cost | |
Small dryer | Twice setting | Clay ( Esp. for Indian and Bengal ) | Solid brick& cell brick( hole rate≤25%) | Semi-Auto /Auto | Lower | |
Chamber dryer | Twice setting | Clay ( Esp. for Indian and Bengal ) | Solid brick& cell brick( hole rate≤35%) | Semi-Auto /Auto | Higher | |
Tunnel dryer | Once setting | Shale,etc. Hard material | Solid brick & cell brick( hole rate ≤25%) | Semi-Auto /Auto | Higher |
semi automatic clay brick machine for clay brick making factory applies to clay, shale, coal gangue, fly ash, slag, mountain mud, silt,
etc. to produce provisions cross-section of ordinary solid bricks, hollow bricks, and other products.
small tunnel dryer in clay brick factoryuse the raw materials to make bricks.
**Why use the dryer?**
(1)High efficiency: Speed up for green brick drying than the natural air drying;
(2)Energy saving: Waste heat from kiln, it can recover the waste heat from kiln;
(3)No influence because of the bad weather, even in a cold, wet or raining day, continuous operation for green brick;
(4)Saving your area and labor: dryer takes small area and a little labors;
(5) Speed up drying: drying chamber is used together with kiln, It can speed up drying.
The small tunnel dryer for automatic Brick Production Line
small Tunnel dryer | capacity | Equipment cost of drye | Production days in a year |
6 tunnels | 15~20 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
8tunnels | 20~25 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
10 tunnels | 25~30 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
12 tunnels | 30~35 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
14 tunnels | 35~40 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
16tunnels | 40~45 million pcs annual | dryer cart, hydraulic ferry pusher, blwer, Three wheel cart, etc | 330 days |
We, Xi'an Brictec Engineering Co. Ltd., not only majors in sale of brick making machines, but also concentrates on the overseas and domestic fired brick designing, kiln designing, factory building designing and turn-key project.
Our company provide solutions to brick & tile making industry by a group of professionals who have more than 25 years experience in the brick and tile making process industry. There are 6 professor-level engineers and 10 with an high title.
We cooperates with brick machinery factories to supply customers with the most suitable machines. Until now ,we have accomplished over 50 brick projects of engineering, trading, technical supporting in Asia, Africa, South American countries.
We also have successfully constructed over 20 production lines in China.
Customers from overseas
I. Design and construction of a turn-key project for modern plant;
II. Design and installation of highly energy efficient and productive tunnel dryer and tunnel kiln system;
III. Retrofit and modernization.
Brictec warmly welcome your inquiry !