4/3C-NHR R26 natural rubber parts impeller D3147
USD $50 - $3,200 /Piece
Min.Order:1 Piece
Shijiazhuang Nainater Slurry Pump Co., Ltd.
4/3C-NHR R26 natural rubber parts impeller D3147
We supply all kinds of slurry pump wet parts with excellent quality in competitive price.
These parts are all standard parts, can fit to the slurry pumps perfectly.
We supply metal and rubber parts for slurry pump series(NH, HH, SP, G, L, ZJ, M models).
various kind of centrifugal pump spare parts , such as Slurry Pump Rubber/metal Impeller,
Metal/ Natural rubber liners, Expeller, etc.
High chrome alloy: A05, A07, A49, etc.
Natural rubber: R08, R26, R33, R55, etc.
Other materials can be supplied as requirements .
Casting, shaft, throat bush, front liner, back liner, wear plate, case, cover, stuffing box, lantern restrictor,
cover plate bolt, volute, throat bush, shaft sleeve, cover plate liner, frame plate liner ,neck ring, expeller ring,
expeller, bearing assembly, volute liner, volute packing, bowl, bearing cartridge, cover plate liner, impeller,
closed impeller, open impeller
OEM Service
We also provide OEM service according to customer's special requirements .
Impeller Pictures
Other Parts Pictures
Manufacturing Processing
Spare Parts Codes
Shijiazhuang Nainater Slurry Pump Co., Ltd is a modern pump industry enterprise engages in professional
manufactore, scientific research, develop, sales and service.
Our company is specialized in manufacturing: Slurry pump and Slurry pump parts, Dredging pump and
Dredging pump parts, Desulfurization pump and Desulfurization pump parts, Clean water pump and Sewage
pumps, are widely used in mine, metallurgy, coal, electric power ,dredge and other sectors of the national
economy. These pumps are sold to South America, Africa, Southeast Asia, Russia and so on more than
20 countries and regions. Our products have won unanimous favorable comments from the market.
The quality management systems of Nainater slurry pump are accredited to ISO 9001:2000 and
our environmental management systems are accredited to ISO 14001:2004.
Packing: Standard Export Plywood Box
Delivery lead time: 10-20 days after deposit received
Payment term: TT/Western Union/Money Gram
OEM service: Available
Loading port: Xingang Port ,Tianjin
Shipment modes: By sea/By air
Factory visit: Available