port cranes for loading of the containers
USD $67,000 - $580,000 /Set
Min.Order:1 Set
Xinxiang Kehao Machinery Equipment Co., Ltd.
Port Cranes For Loading of The Containers
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Lift the Dream
As a crane equipment trader, to lift the heavy goods is only our obligation, not our purse.
To Lift the Dream, this is our purse. The trade consultant would be the super robot of your life, career, and your dream.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A. Product Specification | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Name: port cranes for loading of the containers 1.Loading capacity: 80t ( 20m outreach) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Delivery Time | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Port cranes for loading of the containers : 180days for production, the port loading and custom cost about 6 days, Total time: 210days to 241days
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
B. Parameter & Instruction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
C. Port and Shipyard Container Crane Pictures | |
Product one: Rubber tyre container gantry crane (RTG container crane) | |
Rubber tyre container gantry crane applies to international standard container transporting, loading and unloading at the container yard and railway container depots, use high-quality electronic components which improve the efficiency and safety of the whole machine. Electrical system uses PLC frequency adjustment which can easily control every mechanism.
| |
Product two: Rail mounted container gantry crane (RMG container crane) | |
Rail mounted container gantry crane is one of gantry crane with large hoisting capacity,multiple functions and high efficiency, dedicated to subsection transportation of large ship, butt jointing, and overturning on dock or slipway. applies to international standard container transporting, loading and unloading at the container yard and railway container depots.
| |
Project three: Portal container gantry crane | |
Harbor portal cranes are mainly applied to harbors, ships at wharfs and vehicles for mechanized handling and transshipment, so as to improve the handling efficiency and speed up the turnover of ships and vehicles.
| |
|
D. Case one: Portal container crane in using |
|
|
E. After Sales Services: |
1.14 months warranty when products leave the factory, or 12 months warranty after installation and commissioning in addition to the human damage factors. 2. 2 years spare-parts provided for better maintenance. 3. Professional technical staffs provide installation, commissioning and training services. 4. Delivery with English user manual, parts manual, product certification and other relevant certificates. 5. Technical advisory for any time and Engineers available to service machinery overseas.
|
F. To Lift the Dream |
As a crane equipment trader, to lift the heavy goods is only our obligation, not our purse. |
|
G. Consult Guide |
Estimate Parameter:
I am in China, but serve you in the world.
|