Adjustable scaffoldong props for construction/shoring props
USD $5 - $12 /Piece
Min.Order:10 Pieces
Tianjin Musam International Trading Co., Ltd.
Adjustable scaffoldong props for construction/shoring props
1.Raw Material:
Q195 , Q235 ,Q345 Steel.
2.Application:
Adjustable props jack is applied to vertically support system in the construction to support the scaffolding formwork, such as the floor construction.
3.Structure:
Adjustable props jack is mainly made up of bottom plate,outer tube, inner tube, swivel nut,cotter pin,upper plate and the accessories of folding tripod,head jack, the structure is simple and flexible.
4.Convenient:
Adjustable props jack is simple of the structure, so it is easy to assemble and disassemble.
5.Adjustment:
Adjustable props jack is adjustable because of the outer tube and inner tube, the inner tube could extend and shrink in the outer tube, and then it could be adjusted according to the required height.
6.Economy:
Adjustable props jack could be re-used, and once useless, the material could also be recovered.
7.Practical using:
Adjustable props jack could be adjusted to required height according to the different height of the constructions.
Adjustable props jack Specification list
Middle East Type / German Type adjustable steel props specification list:
Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
MSM-1427 | 1.4m-2.7m | 60mm | 48mm | 1.5mm-3.0mm |
MSM-1627 | 1.6m-2.7m | 60mm | 48mm | |
MSM-1832 | 1.8m-3.2m | 60mm | 48mm | |
MSM-2035 | 2.0m-3.5m | 60mm | 48mm | |
MSM-2134 | 2.1m-3.4m | 60mm | 48mm | |
MSM-2240 | 2.2m-4.0m | 60mm | 48mm | |
MSM-2439 | 2.4m-3.9m | 60mm | 48mm | |
MSM-3050 | 3.0m-5.0m | 60mm | 48mm | |
MSM-3055 | 3.0m-5.5m | 60mm | 48mm | |
Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized |
Italian type adjustable steel props specification list :
Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
MSI-0814 | 0.8m-1.4m | 56mm | 48mm | 1.5mm-3.0mm |
MSI-1630 | 1.6m-3.0m | 56mm | 48mm | |
MSI-1831 | 1.8m-3.1m | 56mm | 48mm | |
MSI-1835 | 1.8m-3.5m | 56mm | 48mm | |
MSI-2035 | 2.0m-3.5m | 56mm | 48mm | |
MSI-2036 | 2.0m-3.6m | 56mm | 48mm | |
MSI-2240 | 2.2m-4.0m | 56mm | 48mm | |
Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized |
Spanish type adjustable steel props specification list :
Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
MSS-0814 | 0.8m-1.4m | 48mm | 40mm | 1.5mm-3.0mm |
MSS-1630 | 1.6m-3.0m | 48mm | 40mm | |
MSS-1835 | 1.8m-3.5m | 48mm | 40mm | |
MSS-2035 | 2.0m-3.5m | 48mm | 40mm | |
MSS-2240 | 2.2m-4.0m | 48mm | 40mm | |
Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized |
Adjustable props jack
Different type
Adjustable props jack
Fittings
Adjustable props jack
Surface treatment
Adjustable props jack
Packing & Loading
Adjustable props jack
Workshop Show:
Adjustable props jack
Comapny Certificate :
- - - 1. Q: What's your MOQ of the Adjustable props jack (minimum order quantity)?
A: One full container,mixed acceptable .
- - - 2. Q: What's your packing methods of the Adjustable props jack ?
A: Packed in bundle or bulk .
- - - 3. Q: What's your payment terms of the Adjustable props jack ?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time of the Adjustable props jack?
A: 10-20 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,musam construction materials co.,ltd do domestic market and musam international trading co.,ltd is the subordinate company of musam construction materials co.,ltd for export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/black. BS1139
(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) steel coupler (pressed/drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
(7) screw adjustable base jack
Adjustable scaffoldong props for construction/shoring props
Together,we make it better !