Galvanized C/Z Shape Purlin Forming Machine Factory
USD $38,000 - $79,000 /Set
Min.Order:1 Set
Hangzhou Zhongyuan Machinery Factory
Why choose this machine?
1. Certificate: ISO 9001, CE,
2. Lifetime services
3. Introduced Mitsubishi PLC with touch screen to machine controll system.
4. Roller cover with 0.05mm chrome; 82mm diameter solid steel shaft. Lifetime>10years.
5. One worker operation (minimum)
6. Heat treatment:Cutting blade. Quenched treatment: Cr12 mould steel cutter
7. Product cut-to-length.
8.Technician overseas installing and training available
Item | Specification | |
Material | Type | Galvanized coils |
Thickness | 1.5-3mm | |
Yield strength | 235Mpa | |
Roller material | Cr12 mould steel | |
Forming speed | 12-15m/min | |
Output speed | 6-8m/min | |
Speed adjusting mode | AC Frequency | |
Roller drive | Decelerating motor + Chain drive | |
Cutting mode | Hydraulic cutting | |
Cutter material | Cr12 mould steel | |
Length measurement | Encoder | |
Control mode | Mitsubishi PLC | |
Operating mode | Button + Mitsubishi Touch screen | |
Main motor power | 15KW | |
Hydraulic power | 5.5KW |
2. Components of machine:
Decoiler -- Feeding & Guiding – Leveling--Punching--Roll forming---Hydraulic Cutting – product to run out table
Here show you more details of our machines:
Packaging Details: | 1. need about 1*40GP container for loading one set machine completely; 2. the whole Wiped Anti Rust Oil, PLC controller covered by foam film; 3. Spare parts and some small parts packed in plastic tooling box; 4. All Components Fixed by steel wire with Container. |
---|---|
Delivery Detail: | within 6 months after getting advance payment. |
Famous Brand: Japanese Mitsubishi PLC and Converter.
Operating Mode: Touch screen and Button.
Why us?
We are professional in making roll forming machines since 2003. Company occupies 6650, in which 5650 for workshops.
1. Capacity: 12-15 sets/month
2. Delivery: in only 5-8 weeks for urgent order
3. Have our own tool center. 12 sets CNC machines.
4. Zhongyuan is a "All-in-house source"
--from raw material to the final high-precision forming machine. We have our precise tooling center.
5. You can rely on our team!
We have engineers with experience more than 15 years in metal forming industry.