Fast construction light steel frame prefab villa house
USD $120 - $250 /Square Meter
Min.Order:12 Square Meters
Shijiazhuang Weizhengheng Light Steel Color Plate Co., Ltd.
Fast construction light steel frame prefab villa house
SpecificationDescription
Lifetime | more than 80 years |
High seismic performance | 9.0-magnitude earthquake |
Wind-proof | 85 Km/h, customize if need. |
Snow resistance | 0.3KN/m2, customize if need. |
Material
Light Steel frame | High quality, G550, AZ275 |
Roof | Terracotta tile, mason tile, metal tile, etc |
Wall | Culture stone, fiber cement board,painting, etc |
Floor | Wood floor, floor tile, carpet,etc |
Celling | Plasterboard, APB, etc |
Partition wall | Plasterboard, metal panel, etc |
Stair | Steel stair or wood stair |
Door | Steel door, PVC door, aluminum door |
Window | PVC window, aluminum window |
Advantage
1.Convenient to assemble and disassemble. |
2.Almost dry construction which is environmental friendly. |
3.Light and reliable, the steel structure is strong and firm. |
4.Nice capacity of water proof, moisture proof and heat insulation and sound insulation. |
5.Practical, good space utilization and high price performance |
The light steel residential building systems reply on the serried studs to bear together, which is greatly different from the beam and column system.
1.1 Roof Profile
WZH.VS provides diverse available roof options covering metal sheet, mason tile, terracotta tile and asphalt. Along with other specialized roof supporting systems, the cilent not only enjoys the elegant facade, but also is guaranteed the excellent acoustic and insulation performance.
2.2 Wall Profile
WZH.VS intergrates the inner insulation material with outer waterproof siding and finishing. It meets the requirement of energy-saving and acoustic and insulation performance, and provides a variety of visual effect on the building facade.
prefab steel structure building / house/villa
1. Payment: we usually accept T/T,L/C, D/P, D/A,please send email to negotiate payment term if you can not accept T/T or L/C
2. Delivery Time
2.1 Design stage: 3 to 10 days after receive
2.2 LGS Frame manufacturing lead time: 15-30 days 40% deposit
2.3 Pre-assembly time: 3~7days
For urgent order, Could be faster, please send email to negotiate
How to make an order?
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies
3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment