Good Price Multiple Drawer General Tool Box Parts
USD $500 - $2,500 /Set
Min.Order:12 Sets
Guangzhou Debeili Hardware Tools Co., Ltd.
Good Price Multiple Drawer General Tool Box Parts AX-96144-6
Total size | L2400*W600*H960mm |
Drawers | Ball bearing slide |
Material | 1.0mm cold rolled steel ( stainless steel optional) |
Surface treatment | Phosphating, powder coating |
Desktop | Stainless steel envelop wood |
1.Total size: L2400*W600*H960mm
including 4 separate tool boxes, each size:L600*W60*960mm
2 units tool box with two doors; 1 unit with drawer; 1 unit with drawer and wheel
2.Three of them with one desktop to connect. a tool cabinet with separate desktop and wheel
3.All drawers have ball bearing drawer slide; aluminium alloy edge strip on the drawer handle
4. Each tool cabinet with lock to control.
5. Powder coating finish, which looks nice and protect the steel
6. Desktop is 36mm wood + 1.0mm thickness #201 stainless steel.
fix on the top of tool storage with screw.
1. FOB port: Guangzhou,Huangpu port. 2. Delivery time: About 30 days after receipt of T/T 30% deposit. 3. Payment: T/T(30% deposit,70% paid before delivery),Western Union,Moneygram are all acceptable. 4. Package: Carton boxes, if you have any requirement of the package, we will according to your request to do. |
Anti-corrosion Treatment
Degrease →Descaling→Phosphating →Powder coating
1. Two wall cabinets can be fixed on the wall; which offer space to store tools and parts
2. Two big closets on the two sides; inside has 4 adjustable shelves
3. Two 7 drawers cabinet ,one 10 drawer cabinet
4. Bottom is with 4" toe kick , it is comfortable for foot when work
5. countertop is made of 1.0mm thickness stinless steel incore 36mm plywood.
6. Main body are made with 1.0mm cold rolled steel.
About Us:
we are a professsional Manufacturer in electeric hydraulic lifing platform&tool cabinet and repair parts ect.
Our products have design, new styles, safe delivery and first-class after service.
What's more, our company has always insisted on honesty,quality first, customer priority,the principle of win-win cooperation
Q:What's the leading time?
A: It's normally 7-35 days.
Q:About the payment?
A:30%T/T as deposit,70% balance paid before shipping.(T/T,Western Union,Moneygram are all acceptable.)