Modern prefabricated house made in china , Chicken house price , Steel structure building house plans , construction building
USD $30 - $100 /Set
Min.Order:1 Set
Modern prefabricated house made in china , Chicken house , Steel structure building house plans , construction building
The main construction technology procedure of modern prefabricated houses made in china
as chicken house or steel structure building houses:
House plans - cast construction lines - embedding of bolt in foundation concrete – (processing and production of steel structure) lifting of gantry steel frame – installation of crane beam – installation of roof truss, roof covering and eave panel – installation of shingle - coating of steel structure.
Processing and Production of chicken prefabricated house construction buildings:
1. Steel Structure Building Material Preparation
a. This procedure is the material inspection part and it includes the project chosen type, specification confirmation and material quality inspection for construction building.
b. Quality detection standards: it should comply with the design requirements and current national standard.
c. Test Method: check the steel quality certificate and retest report, and check type and specification with steel tape and caliper.
2.Lofting and Marking off for chicken house or steel structure building houses:
a. When lofting and scribing, you should clearly indicate the assembly mark, the screw hole mark, the position and direction of reinforcing plate, tilted mark as well as the center line, datum line and inspection line, and make a sample if necessary.
b.Pay attention to the reserved production, welding shrinkage allowance while installation, installation reserved size requirements as well as cutting, edge planing and milling machining allowance.
c. Before making line, the bending and deformation of the material should be corrected. Operating personnel should strictly abide by the welding specification table.
3. Steel Structure Building Welding
Gantry automatic submerged arc welding is to weld steel column and steel beam, and manual welding is used to weld beam connection plate and ribbed plate. The following two points should be met using the gantry automatic welding:
a.The rust, burrs and other dirt within 30-50 mm behind welding edge must be cleaned to reduce factors that produce welding defects.
b.Arc plate should be the same as the parent metal material. Welding groove should be similar and its length should comply with the provisions of the standard. The following requirements should be met to use manual arc: the good condition and fully functional welding machine is used and the selected welding rod need drying by the drying box.
Picture | Item | Description |
Galvanized C-shaped steel | It has a uniform and smooth zinc layer with strong adhesion. Its dimension is precise. It is covered by zinc completely with 120-275g/m² zinc on its surface. It is corrosion-resistant and durable with a long service life for construction building | |
C-shaped steel | It is mainly used as purlin and can also be used as bracket, beam, tiepiece, etc. Besides, it is used for welded pipe, cold bent steel, highway rail, etc. It can support roof and wall of modern prefabricated houses made in china | |
Stand column | Stand column | |
Composite tile | Composite tile is compounded by panel, bottom plate and thermal insulation core materials through binder (or foaming). It is mainly used for industrial workshop, warehouse, refrigeration house, box packing, light steel housing, sandwich room, portable house, all kinds of purification room, air conditioning room,chicken house and steel structure building houses etc. | |
Roof panel | It carries load from roof directly. It is used as roof board and wall for modern factory, fertilizer plant, sewage treatment plant, electroplating factory, power plant, rearing farm, market, warehouse and other large industrial buildings or it is used to renovate plants construction buildings. | |
Monolayer color steel plate | Featuring light weight, thermal insulation, high strength, bright color, flexible and quick installation, it is used for portal house, factory building partition, suspended ceiling, wall panel, roof panel, etc. | |
Corrugated roof panel | It is used to partition room and suspend ceiling for clean factory in machinery, electronics, chemical industry, medicine, biology, food, health and other fields. | |
H-shaped steel | H-shaped steel is a new type of economic construction steel. It is often used for large constructions (factories and high-rise buildings) with strong carrying ability and stable section, bridge, ship, lifting and transportation machinery, equipment foundation, bracket, foundation pile, etc.
|
Production line for modern prefabricated houses
Engineering and Installation of modern prefab houses made in china
How much snow load could the chicken house or steel structure building houses bear?
A: it depends on the local climate condition. The load for the snowy areas is 0.5KN/m2
How much wind scale could the steel structure buildings resist?
A: 6-7 scale for conventional design. In other case, the clients should provide coefficient of wind load.
How long is the delivery date?
A: According to the order size and modern prefab houses production arrangement
How much time does it need for steel structure buildings installation?
A: Generally speaking, 6-10 workers can complete 1000 square meters of factory installation in 7 days. According to the complexity of plant design, group scheduling to coordinate the actual time limit for the project.
Does your company have any experiences of export?
A: We export products perennial. (Russia, Pakistan, Dr Congo, Africa, etc)
Do you offer install service to the foreign project? And how much is the fee?
A: Yes. And we send engineer for spot guidance.
Is the installation complex?
A: We provide installation drawing for the chicken prefabricated house construction buildings. Our engineers would go to guide installation at site. And the workers assemble according to the drawing.
Is it easy to unload?
A: for domestic clients, you can unload by crane. For foreign clients, we will weld track in the container and package the goods and weld trundles. So you can pull the goods out directly.
What’s the service life of the color plate for the chicken house or steel structure building houses
?
A: Usually more than 50 years, but it also depends on the specific environment.
How to prevent corrosion of the steel structure buildings?
A: We will make shot blasting, spry antirust paint and water proof paint for twice time to avoid the plate contact with air at the greatest extent. After spraying, we package the steel structure immediately to protect the paint coat.