PVC 45 ELBOW
USD $0.043 - $2 /Piece
Min.Order:3000 Pieces
Shanghai Xinguanghua Plastic Industry Co., Ltd.
PVC FITTING
Nominal size: 3/8'-4' inch
For water supply and sewage
.
Introduction of product
Qualified products in line with the National Plastic Products Quality Supervision and Inspection,named”no poison green Bestsellers”.Recommended use in the country
Featrue:
1.)Light and durable,Handling, loading and unloading, construction is convenient
2.) Resistance to chemical resistance,Acid ,alkali and corrosion resistance
3. )Pipe wall smooth,Fluid resistance
4.)Mechanical strength,Pressure resistance, high impact strength
5.)Construction convenient,pipes combined with rapid and simple construction
6. )Do not affect water quality,Belong to the greenbuilding materials
7. )Low cost,Long service life
Installation Method
1.)Incisions and lacerations
Can easily use a fine-tooth saw or pipe cut machine cutting,Cutting the pipe to ensure that the discharge port is flat and perpendicular to the axis. After cutting should be outer pipe orifice chamfering,The slope should be 15 ° -20 °
2.)To try socket, crossed
Before bonding should socket oral inserted,and inserted into the surface to draw inserted into the socket depth marking
3.)Clean-up face
Before bonding pipes and fittings should strictly check the nozzle and the surface of the socket.After Check no pollution,With a clean dry cloth or cotton yarn to wipe clean the inside and outside of the socket
4.)Brushing adhesive
The socket should use clean and free of dirt brush dipped in adhesive quickly brushing the jack.first coated socket brushing, then coated jack.Evenly brushing, shall not leak spreads and shall appropriate to the amount of adhesive
5. )Connection
Find the positive direction of the socket alignment socket quickly inserted, pressing hard, Insertion depth to the chain line and reaches the root of the mouthpiece,and guarantee the straightness of the Order of the interface and the interface to the correct position,the socket should once completed.When inserted into the 1/2 socket should be a little rotation, but should not exceed 1/4 turn,then inserted into the end,No further rotation
6.) Maintenance of the socket
After completion of the bonding process,should be clean the residue of excess adhesive,
Bonding site within one hour should not be affected by external force and shall not pass water within 24 hours.
Scope of application
Civil construction water supply project, municipal engineering,chemical engineering,agricultural irrigation project,landscaping engineering,Water plant water supply project,mariculture industry
6)Experience: Over 30 years of experience in Thermoplastic Extrusion and Injection;
7)Quality Assurance: 24-hour Rigorous QC Team which is ISO 9001 Certified;
8)Laboratory: Advanced Laboratories with a complete system of up-to-date testing equipment;
9)International Projects: Water Supply Projects in Asia, Africa, New Zealand, Caribbean Countries;
Specialised Projects: Specialised Pipes in USA, Canada.