High efficient red chilli drying machine
USD $15,000 - $60,000 /Set
Min.Order:1 Set
Jinan Kelid Machinery Co., Ltd.
High efficient automatic red chilli drying machine
1. red chilli drying machine Description
1). Processed Objects:vegetable,fruit,flower,tea,nuts,herb,wood,paper,box-lunch in large quantity,sauce and so on.
2). Advantage:Quickly and evenly heating,High efficient,Sterilization, Mouldproof, Fresh,PLC automatic system.
3). Good Market Outlook: High Efficient,Healthier System,Wide application make micor-oven in hugh demand.
2. red chilli drying machine Operating Principle
3. red chilli drying machine technical parameters
Power supply | 380V±10% 50HZ±1% three-phase five-wire |
Microwave Output Frequency | 2450±50MHz |
Microwave input apparent power | ≤42KVA |
Microwave output power | ≥30KW |
Microwave power adjustment range | 0-30KW(adjustable) |
Ambient temperature | -5-40°C |
Relative humidity | ≤80%, Surrounding environment:no corrosive gas, conductive dust and explosive gas |
Overall dimension(L*W*H) | about10680*840*1750 mm |
Transmission speed | 0-10m/min(adjustable) |
Height of the inlet and outlet | 60 mm |
Microwave leak | accord with a country GB10436-89 standards(<5 mw/cm^2) |
Equipment safety | accord with GB-5226Electrical safety standard accord with a country GB16798-1997 Food machinery |
Before sale services:
1.Provide the free consultation of the equipment
2.Provide the standard device and the flow chart
3. According to the clients'special requirement, offering the reasonable plan and free design helping to select the equipment.
Services during the sales:
1.Help client design the factory and offering professional advice, free engineering drawing for the factory layout.
2.Welcome to visit our factory or the domestic clients’ factory.
3.Inspect the machine before leaving the factory.
After sale services:
1. Oversea install and debug the equipment.
2. Train the first-line operator.
3. Provide the basic formula
4. Operation/ Service/ Maintenance Manual: Provided In English.
5. We will provide 1-2 engineer to the client's factory for the installation and teach totally in 10 days. The client need provide room, food, round-trip transportation, visa and a nominal $40 daily subsidy per person.