HOT ! Zin Coated Screw Bolt for Minning
USD $1 - $50 /Piece
Min.Order:100 Pieces
Ningbo Rotie Metal Parts Co., Ltd.
HOT ! Zin Coated Screw Bolt for Minning
About us
Ningbo Rotie Metal parts Co, LTD specializes in CNC machining service for customized mechanical components which are widely adopted in engineering, construction, machinery and mining industries.
Our advantages:
Offering decent quality with the most competitive price;
Owning 5 workshops under our operation, always delivery on schedule;
With over 30 years’ skill experience, our technicians have specialty on complicated workpiece in machining and welding fields.
Equipment list:
80 pc CNC machines 3 pc Vertical machining centers 5 pc Radial drills,
2 pc high precision surface grinding machines 2 pc universal milling machines
Rotie sincerely hope to estimate a long term partnership with every new clients.
Products | Precision cnc machining parts |
Materials | Iron, aluminum, steel, copper,carbon steel, bronze, solder alloy, HSS, tool steels, or as per the customers' requirements. |
Dimensions | According to customer' s drawing |
Surface treatment | Blacking, polishing, anodize, chrome plating, zinc plating, nickel plating, tinting or other as requirement. |
Packing | plastic bag, carton, plywood box, or as per the customer' s requirements |
Processing equipment | CNC machine,CNC machining center, CNC cutting machine, radial drill, universal milling machine, high precision surface grinding machine, chamfering machine, etc. |
measure equpment | precision plug gague, gauge block, digital outside micrometer, outside micrometer, digital caliper, inside micrometer, inside dial indicator, dial vernier caliper, dial indicator, depth vernier caliper and so on |
QC System | 100% during production check and random samples before shipment. |
Tolerance | +/-0.01mm |
Business scope | cnc machining parts, cnc drilling, cnc turning, grinding, casting, forging, welding, sheet mental working etc |
Application | mechanical components for engineering and construction, machinery, and mining industries. |
MOQ | negotiable |
Payment | 30% in advance, 70% before shipment. Samples 100% in advance |
Ports | Ningbo or Shanghai |
Delivery | samples 7-15 days, batch production 30 days at least. |