Automatic jelly filling and sealling machine
USD $8,350 - $8,500 /Set
Min.Order:1 Set
Shanghai Shenhu Packaging Machinery Equipment Co., Ltd.
Can pack coffee powder in small cups like K-cup capsule, nesspro capsule, lavazza and so on. We also can suppy the empty cups.
Japnese OMRON PLC,
DEC switch
AIRTAC piston(opitional)
S. S. Frame
powders(or other kinds of powder products like tea powder, cocoa powder etc. )
It is specially designed for filling small coffee capsule cups for k-cup with fiter already or cup and filter separate.
We have successful experience design and manufacture for different kinds of coffee capsules: Very small cups, the filling system has press function to ensure all fluffy powder into the cup/capsule compact.
product name | jelly filling and sealling machine |
Filling range | 7-12g (special order optional) |
Output | 800-1000cups/hour (special order optional) |
Air consumption | 0.8 M3/min |
Voltage | 380V 50Hz |
Dimension | 1200mm*1200mm*1850mm |
Weight | 250kg |
Standard Export wooden case.
Delivery within 15-30 days
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2.Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
3.Quality assurance
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.
Shang hai shen hu Machinery Co., Ltd. is located in shanghai. We are specialized in manufacturing tube filling and sealing equipments for more than 10 years.
The automatic tube jelly filling and sealling machine HTGF series we manufactured are well known in China. Many trading companies order from us export to their customers. We provide high quality machines with life-long aftersale service.
Warmly welcome you to visit us!
If there is any confusion, please feel free to contact us.