Flat Plate Daily Necessities PVC Paper Clamshell Blister Packing Machine Wholesale
USD $45,000 - $50,000 /Set
Min.Order:1 Set
Shanghai Shenhu Packaging Machinery Equipment Co., Ltd.
High Performance Automatic Blister Packaging Machine for Auto Parts and Hardware
Hot Sale CE Approved China Manufactuere PVC and Paper Card Blister Packing Machine for Nipple
High Frequency Clamshell Blister Pack Hardware Blister Automatic Packing Machine
AUTO Toothbrush/Scissors/Battery/Solid Gum Paper-Plastic Blister Packing Machine Wholesale
egg carton machine/carton box machine/paper box packing machine
carton packing machine/bottle pack into paper box/bag in carton machine
Flat Plate Daily Necessities PVC Paper Clamshell Blister Packing Machine Wholesale
1. Machine working video
2. Brief Introduction
SH-500D Daily Necessities PVC Paper Clamshell Blister Packing Machine has the feature of advanced technology, complete function, reasonable working process, easy operation, and convenient maintenance. The whole working process is full automatic, which can really save you a lot of labor cost. Moreover, the operation is very easy, you only need one staff to operate the PLC.
This machine is suitable for the blister card packing of battery, stationery, food, medical equipment, toys,hardware, electronics, auto parts, daily use product, cosmetic etc, such as the injector, solid gum, toy car,scissor, flashlight, battery, spark plug,lip stick, hook, shaver, pencil etc.
3. Parameters of the Machine
Blister Packing Machine | Flat Plate Daily Necessities PVC Paper Clamshell Blister Packing Machine Wholesale |
Model | SH-500D Daily Necessities PVC Paper Clamshell Blister Packing Machine |
Maximum travel range | 40-200mm |
Maximum forming area | 480×200mm |
Standard forming depth | 40mm( can be customized) |
Cutting frequency(times/min) | 12-25 times/ minute |
Air pressure | 0.5-0.8Mpa |
Air flow | ≥0.5m3/min |
Total power | 380V 50Hz 10.5kW |
Main motor power | 1.5kW |
Overall dimension | 5800*1050*1850mm(L*W*H) |
Machine weight | 2100kg |
4. Machine Working Procedure
5. Samples
6. Electrical configuration list for SH-500D Automatic Blister Card Packing Machine
No | Name | Model | Unit | Qty | Origin |
1 |
Servo motor | MHMD082P1U | set |
3 |
Panasonic |
MCDDT3520 | |||||
2 |
Reducer | 90-WPE-010 | PCS | 1 |
Panasonic |
90-PLE-010 | PCS | 1 | |||
3 | Touch screen | NP5-SQ000B | PCS | 1 | OMRON |
4 | Encoder | E6B2-CWZ6C 1000 wire | PCS | 1 | OMRON |
5 | Inverter | 3G3JZ-A4015 | PCS | 1 | OMRON |
6 | PLC | CP1H-X40DT-D | PCS | 1 | OMRON |
7 | PLC extension | CP1W-CIF11 | PCS | 1 | OMRON |
8 | PLC extension | CP1W-16ET | PCS | 1 | OMRON |
9 | Temperature module | CP1W-TS002 | PCS | 1 | OMRON |
10 | Switch power | S8JC-Z10024C | PCS | 1 | OMRON |
11 | Photoelectrical switch | E3Z-T61A 2M | PCS | 6 | OMRON |
12 | Intermediate relay | LY2NJ DC24V | PCS | 3 | OMRON |
13 | Intermediate relay | G6B-4BND DC24V | PCS | 4 | OMRON |
14 | Approximate switch | TL-Q5MC1-2 | PCS | 5 | OMRON |
15 | Solid state relay | G3NB-240B DC5-24V | PCS | 3 | OMRON |
16 | AC contactor | 3TS3411 220V | PCS | 1 | Siemens |
17 | Air switch | 5SJ6225-7CC | PCS | 1 | Siemens |
18 | Air switch | 5SJ6125-7CC | PCS | 1 | Siemens |
19 | Air switch | 5SJ6332 | PCS | 8 | Siemens |
20 | Button | PB1M-10 green | PCS | 3 | Siemens |
21 | Button | PB1M-01ZR red | PCS | 1 | Siemens |
7. Hot Sale Products
1.Packing Material: Wooden Cases
2.Shipping Time: Within 30 days after deposit was paid
1. How About the Installation & Adjustment?
After the equipment arrived at the customer’s site, customers are responsible for unpacking and arranging the equipment in reference to the placement drawing or under our install-adjust technicians’ guidance. Costs of our staffs are decided at last.
2. Are There Training for Customers?
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
3. How about the "Quality Assurance"
We are responsible for the faults and damages of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc.The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.How about the Warranty?
We offer 12 months maintenance period to the problems that caused by our design, manufacture, and material quality, and offer the relevant parts and effective services for free if the problems was caused by above reasons. We will offer a life-long technical support, after service for customers.