High quality waterproof coating for walls, One-component polyurethane waterproof coating
Single-Component Polyurethane Waterproof Coating is made out of the main materials of isocyanate and polyether polyol, togethering with various auxiliaries and filled by polyreaction , coating on the waterproof base layer, after chemical reaction of NCO terminal group of polyurethane prepolymer and moisture in air.It forms a seamless elastomeric rubber waterproof membrane.
Main Feature:
1.Construction on the surface of the base in wet or dry a variety of materials
2. The coating has high strength tenacity, water resistance, weatherability, excellent durability
3. Can add pigment, forming a color coating
4. Non-toxic, tasteless, no pollution, construction safety supervision, short construction period
5. Construction at the top of the elevation, slope and top surface does not flow
6. With the base and cement mortar and other materials solid paste
7. High temperature resistance can reach 40 degrees
Item | Units | Index | |||
I | II | III | |||
Solid content ≥ | % | 70 | |||
Tensile strength | Without treatment≥ | mpa | 1.2 | 1.8 | 1.8 |
Retention after heat treatment≥ | % | 80 | 80 | 80 | |
Retention after alkali treatment≥ | % | 60 | 70 | 70 | |
Retention after soaking treatment≥ | % | 60 | 70 | 70 | |
Retention after UV treatment≥ | % | 80 | - | - | |
Elongation at break | Without treatment≥ | % | 200 | 80 | 30 |
after heat treatment≥ | % | 150 | 65 | 20 | |
alkali treatment≥ | % | 150 | 65 | 20 | |
soaking treatment≥ | % | 150 | 65 | 20 | |
UV treatment≥ | % | 150 | - | - | |
Low temperature flexibility (Φ10mm bar) | -10 °C | No cracks | - | - | |
Adhesion strength | Without treatment≥ | mpa | 0.5 | 0.7 | 1 |
Wet substrate≥ | mpa | 0.5 | 0.7 | 1 | |
Alkali treatment≥ | mpa | 0.5 | 0.7 | 1 | |
soaking treatment≥ | mpa | 0.5 | 0.7 | 1 | |
Water tightness | 0.3kpa 30min.Impermeable | ||||
Leakage resistance( back of cement mortar)≥ | mpa | - | 0.6 | 0.8 |
1 Substrate treatment:
The substrate should be free of water, dust, grease and other contaminants.
2 Construction technology:
The product can be applied by brushing, dry-sprinkling, tamping and spilling, and spraying methods:
3 Brushing method
4 Dry-sprinkling method
5 Tamping and spilling method
6 Spraying method
Requirements for Construction:
1. The base should be dry and clean. Do not work in rainy or snowy day.
2. Do not work under heavy wind. (Temperature need be above 5℃)
3. If it is rain or snow in the process of construction, protective measure to the laid membrane is necessary.
4. All the workers should put on special uniforms to keep safe when installing. There should be equipment for fire controls.
1. Are you manufacture or trading company?
A: We are manufacture; our factory is located in Taitou Industrial Zone, Weifang City.
2. How long have you been in waterproofing?
A: Our company has been in waterproofing industrial for more than 30 years.
3. Can I have samples before order?
A: Yeah, Free sample is available
4.How long you need to process my order?
A: We have stock for all type membrane, we can ship you order in 3 working days.
5.What quality guarantee can I get?
A: We have 1 year quality guarantee, please understand we not guarantee for your wrong operation or storage.