poultry farms aquaculture wastewater treatment equipment
Livestock and poultry farming wastewater treatment method, combined with chemical method and constructed wetland method, removes nitrogen from wastewater with high removal rate, high speed and low cost, recycles bird droppings and stones, saves resources and realizes sustainable development concept; removes phosphorus while removing nitrogen, with a good deal of effort; planting regenerated flowers and elephant grass in constructed wetland pond can not only absorb nitrogen, but also beautify the environment. Purifying air; adjusting pH with acetic acid can not only change pH, but also increase acetic acid content in sewage, which can increase the amount of biogas generated during anaerobic treatment; the biogas generated can be used for cooking and lighting of farmers, saving a lot of coal, natural gas and electricity; the filtered suspended matter can be used as crop fertilizer to reduce the cost of farmers'planting; the non-woven fabric is used as biofilm, and the price is low. Long life, greatly reducing costs.
model | wsz-1 | wsz-2 | wsz-3 | wsz-5 | wsz-7 | wsz-10 | wsz-15 | wsz-20 | |
treatment ability | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | |
Blower | Air volume | 0.31 | 0.59 | 0.67 | 1.02 | 1.72 | 2.5 | 4.11 | 4.11 |
wind pressure | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | |
power | 0.55 | 0.75 | 1.5 | 1.5 | 2.2 | 3.7 | 5.5 | 5.5 | |
Water pump | flow | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 |
lift | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |
power | 0.55 | 0.55 | 0.55 | 0.75 | 0.75 | 0.75 | 0.75 | 0.75 | |
The measure of area | 6 | 10 | 14 | 19 | 20 | 28 | 29 | 38 |
Shandong Zhuhai Environmental Protection Technology Co., Ltd. is a company specializing in R & D, design, production, installation and debugging of sewage treatment equipment around the direction of national industrial development planning guidance and the application of advanced technology experience at home and abroad. Its main business scope is sewage treatment, slaughterhouse sewage treatment, The design, construction, installation, commissioning and technical consultation of the food processing and industrial sewage treatment, the water reuse, the waste incinerator and other equipment, as well as the various sewage treatment projects.
1, strictly according to the requirements of the buyer, ensure the progress and ensure the quality of the project.
2. All the materials provided by us and the overall project are free of charge for 12 months. The warranty period is calculated from the date of the final completion of the final completion of the project.
3, any project which belongs to the scope and contents of our contract, we will reply within 4 hours after receiving the notice of repair, and start processing plan within 72 hours. We do not send someone to repair it within the agreed time limit. You have the right to entrust another person or repair it yourself.
4. After-sales service provided to the buyer during the warranty period is free of charge.
5, we promise to maintain the whole life and provide repair service to this project at a preferential price (cost price), so as to ensure the normal use of this project.