Product Details

Village integrated waste water treatment plant/WWTP

Place of Origin Shandong, China
Brand Name jinhaosanyang
Model Number WSZ

Product Features

STP Village integrated buried domestic sewage water treatment plant 

 

 

 

Product Description

 

1.       Overview

The device is an underground plant which adopts the advanced Biological technology and the company’s scientific research and engineering practice result, it can effectively remove BOD5,COD and NH3-N. The device is characterized by the stable performance, effective treatment, economical investment, automatic operation, convenience of maintenance and small occupying space. There is no need for plant construction, neither heating and heat preservation. The surface can be used as green land or square land.

As the most efficient sewage treatment device, it is widely used in treating the sewage in the area of senior hotels, villa districts and residential districts, etc. The water after treatment would meet the national emission standards.

 Village integrated waste water treatment plant/WWTP

2.       Main Features

 

(1)     The device can be buried below the earth’s surface. The surface can be used as green land or square land. Therefore, the device covers no surface area. And there is no need for plant construction, neither heating and heat preservation.

(2)     The device use plug flow biological contact oxidation pond, the effect is better. Besides, it is smaller than active sludge pool. The applicability to the water is stronger, impact resistance performance is good, discharging water is stable, there is no sludge expansion. In addition, the new elastomeric stereoscopic materials in the oxidation pond have a higher removing rate, and also can improve the water solubility of oxygen.

(3)     Because of the low volume load of fillings in AO bio-treatment technology of the device, and microbes are in the stage of oxygen, it would produce less mud. Generally only 90 days for one sludge removal.

(4)     Except for the conventional air exhaust, the device is equipped with soil deodorization measure as well.

(5)     The device is equipped with fully automatic electric control system and equipment damage alarm system. The device has a good reliability, generally, there is no need for special management, a monthly or quarterly maintenance is ok.

 

3.       Usage

(1)     The device can be used in treating the domestic sewage and related organic sewage;

(2)     The device features easy operation, automatic control, it can be buried under the ground;

(3)     Convenient maintenance, the working life can be more than 30 years.

 Village integrated waste water treatment plant/WWTPVillage integrated waste water treatment plant/WWTP

4.       Application

(1)     Hotel, restaurant, sanatorium, hospital, school;

(2)     Residence community, villa district, village, town;

(3)     Station, airport, seaport and dock;

(4)     Factory, mine, army, beauty spot;

(5)     All kinds of industrial sewage similar to the living sewage, etc.

Village integrated waste water treatment plant/WWTP 

 5.   Technical parameters

Village integrated waste water treatment plant/WWTP

 

Company Information

 Village integrated waste water treatment plant/WWTPVillage integrated waste water treatment plant/WWTP

 

 

FAQ

 

1. How to buy your interested products?

  ANS: You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project (More details, please contact us).

2. How to pay?

  ANS: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

3. What is the delivery time?

  ANS: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

4. How to pack the products?

  ANS: We use standard package. If you have special package requirements, we will pack as you required, but the fees will be paid by customers.

5. How to install after the equipments arriving destination?

  ANS: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.   

6. How long is the validity?

  ANS:The validity is 12 months from B/L date.

 

 

Our Service

  

1. Detailed installation manual and maintenance guideline are provided with the equipment.

2. Technical training and site-commissioning are available for you.

3. Any equipment issue, we will stand by. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

4. About the after-sales supervisory problems, you can call +86 536 6184876. We have professional engineer help you solve related equipment questions.

 

Contact Us

 Village integrated waste water treatment plant/WWTP

 

 

 

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now