low frequency three phase out 10kw hybrid inverter 3 phase with Batteries inside
1.Low noise
2.Double-conversion real on-line type technology
3.Static bypass
4.Manual maintenance bypass
5.Double CPU direct digital signal processing
6.Computer remote supervisory and control management
7.Touch large screen LCD display
8.Wire and wireless communication remote alarm
9.Intelligent short-circuit protection function
10.Malfunction automatic check and alarm
Model XD-SSL33 | SSL33-10/15/20/30/40/50/60/80/100/120/140/160/200/300/400KVA | ||
Rated power | 8/10/16/24/30/40/50/64/80/96/120/128/160/240/320Kw | ||
Operating mode and principle | On-line type power supply static bypass switch (uninterruptable switching), double conversion digital technology, output power supply safety isolation | ||
AC input | Wiring | Three phase four wires | |
input voltage | 380±25% | ||
input frequency | 50Hz±10% Or 60Hz±10% | ||
Input power factor | 0.92(with input filter) | ||
Soft start | 0-100% 5sec | ||
Bypass input | Number of phases | Three phase four wires | |
input voltage | 380±25% | ||
input frequency | 50Hz±10% Or 60Hz±10% | ||
Inverter/bypass conversion time | 50Hz±10% Or 60Hz±10% | ||
Rated DC input | 384V | ||
DC system | Floating voltage | 442V | |
Cut-off voltage | 336V | ||
Charging voltage | 5A-15A(adjustable)5A-15A (adjustable) | ||
AC output | Number of phases | Three phase four wires | |
Nominal voltage | 380±1% | ||
Nominal frequency | 50Hz-60Hz±0.5 (battery-powered) | ||
Power factor | 0.8(Lagging) | ||
Output waveform | Pure sine wave | ||
Total harmonic distortion | Pure load<2%, nonlinear load<5% | ||
Dynamic load voltage transient | 0-100% jump) ±5% | ||
Transient recovery time | 10ms | ||
Unbalanced load voltage difference | ±2% | ||
Overload capacity | 125%10min,200%100ms | ||
Cooling method | Forced-draft | ||
Protection | Short-circuit current characteristic | shortcircuit current protection, current is limited in two times of rated current,will stop automatically in 5 secs if over | |
DC input | Fuse | ||
System index | Full load efficiency | 93% | |
Computer communication interface | RS232 Or RS485 | ||
Running temperature | 0-40℃ | ||
Storage temperature |
| ||
Relative humidity | 30%-90% | ||
Running height | <1000 meters (the power will drop by 1% for every 100m added) | ||
Cooling method | Forced-draft | ||
Noise(DB) | <55db | ||
Weight(KG) | 175~2500 | ||
Size(W×D×H)mm | 395*700*1070~1000*800*1650 |
package
1. We have the carton box and wood package, it depend on the reated power of the inverter
Shipping
1. Fedex/ DHL/ TNT/ UPS for samples, door-to-door.
2. By air or by sea for batch goods, for CFL, Air port/ Port receiving.
3. Customers specifying freight forwarders or negotiable shipping methords.
4. Delivery time: 7 days for samples; 10 to 25 days for batch goods.
Payment Terms
1. Payment: T/T, Western Union, Paypal, Moneygram. 30% deposits, 70% balance before delivery time.
2. MOQ: 1 PCS
3. Warranty: 1 years for inverter, controller, battery. 10 years for solar panel.
Q1: Are you a factory?
A1: Yes, we are a factory of inverter , UPS,solar controller and solar generator since 2005 year.
Q2: Can you provide free sample?
A2: Yes, we will charge when first time to place order, but return back when our customer re-order.
Q3:How about the delivery?
A3: would be on time since we have reasonable workshop working schedule and worker to support.
Why Choose Us?
1. We are Alibaba assessed gold supplier.
2. We are a professional manufacturer of power inverter and controller with over 10 years experience.
Best production capability, best quality control, best service.
3. 100% QC inspection and testing before shipment.
4. CE listed, competitive price.
Sherry is 24 hours, 7 days Hot Line for consulting and Technical Support.
Sherry Yang(+86 13760629244/whatsapp)
Skype:sherry412008
Address: 3/F, Bldg.3, area C, European Industry Park, Chancheng Dist., Foshan, Guangdong, China