Products Description
• Continuously overall promotion makes our lifting capacity of crane be improved once and once again.
• 43m main boom , two section jibs (9.5,16m).
• Optimized central slewing position increases the lifting capacity of the crane over rear.
• Large outrigger span improves the working stability of the crane greatly.
• Adopt internationally advanced structure analysis and calculation methods to develop the lifting capacity of crane deeply.
• Leading boom manufacturing process in trade.
• 43m main boom , two section jibs (9.5,16m).
• Optimized central slewing position increases the lifting capacity of the crane over rear.
• Large outrigger span improves the working stability of the crane greatly.
• Adopt internationally advanced structure analysis and calculation methods to develop the lifting capacity of crane deeply.
• Leading boom manufacturing process in trade.
Specification
Item | Value | Remarks | ||
Working performance | rated lifting capacitykg | 16000 | ||
load moment of basic boom | 980 | |||
kN.m | ||||
load moment of boom lengthkN.m | 573 | |||
lifting height of basic boom m | 11.5 | |||
lifting height of boom m | 33.8 | Deformation of the boom is not taken into consideration. | ||
lifting height of jib m | 41.6 | |||
Working speed | hoist rope speed (main winch) m/min | 120 | At 4th layer | |
hoist rope speed(auxiliary winch) m/min | 100 | At 2nd layer | ||
Boom derricking times | 40 | |||
Boom extending times | 60 | |||
Slewing speed r/min | 0~2.2 | |||
Traveling specifications | traveling speed km/h | 78 | ||
gradeability % | 37 | |||
Min. turning diameter m | ≤22 | |||
Min. ground clearance mm | 220 | |||
Limits for exhaust pollutants and smoke | Meet with related standards | GB3847-2005 | ||
GB17691-2005 | ||||
(National stage III) | ||||
Oil consumption per hundred kilometers L | 45 |
Details Images
Recommend Products
Our Advantages
Company Profile
FAQ