Product Information
Outer Diameter | 10~610mm |
Wall Thickness | 0.95~17.75mm |
Length | 3-12M according to client requirement |
Standard | EN10025, EN10219, EN10210, EN39, BS1387, |
ASTM A53, ASTM A500, ASTM A36, API 5L, ISO 65 | |
JIS G3444,DIN 3444, ANSI C80.1, AS 1074, | |
GB/T 3091 | |
Material | Gr.A, Gr.B, Gr.C, |
S235, S275, S355, | |
A36, SS400, | |
Q195, Q235, Q345 | |
Certificate | ISO 9001:2008,SGS, BV, CCIC etc |
Finish of pipe | Hot dipped galvanized with zinc 220~260g/m2; |
Painted with black/varnish lacquer; | |
Oil on the surface to prevent rust; | |
Bare pipe without painting: | |
Epoxy painting/FBE coating/3PE coating | |
Pipe End | Plain end/ Bevel end; |
Threaded on two ends, one end with coupling, one end with plastic cap | |
Marking | As per client requirement or mill standard |
Packing | OD not less than 273mm: Loose packing,piece by piece. |
OD less than 273mm: In hexagonal seaworthy bundles packed by steel strips. | |
Small sizes nested into big sizes. | |
Applications | Construction / Building materials steel pipe |
Scaffolding pipe | |
Fence post steel pipe | |
Fire protection steel pipe | |
Greenhouse steel pipe | |
Low pressure liquid, water, gas, oil, line pipe | |
Irrigation pipe | |
Handrail pipe | |
Techinical | ERW (high-frequency welded) |
Trade Term | FOB, CFR, CIF, EXW, FCA |
Delivery Time | 15-45 days (based on quantity) after receiving advanced payment by T/T or LC . |
Production Process
Surface Treatment
End Treatment
Quality Inspection
Product Application
Packing & Shipping
About Us
steel pipe ,ERW steel pipe, galvanized steel coil/sheets ,scaffolding steel props, PV mounting system .
FAQ
Q:What is the MOQ?
A:One ton if on stock, 5tons for new size
Q:How does your company do regarding quality control?
A:BV and SGS certificates, production process followed the ISO 9000 system.
Q:How long Can You Guarantee for This Product?
A:We will follow the order one year,if any problem,can contact us.
Q:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting,coating,pipe cutting, etc.
Q:What is your terms of packing?
A:Generally, In bundles; or according to customer's requirements