Steel strip packing for steel tube profiles
USD $480 - $650 /Ton
Min.Order:1 Ton
Steel strip packing for steel tube profiles
Keywords: steel tube profiles
1. Description of steel tube profiles
1) Standard:ASTM A252/B36.10/A450/ A671/A53/ A523, GB/T9711/ GB/T3901, GB/T 13793,
BS1387, BS EN10296, BS 6323, BS6363, BS EN 10219,API 5L ..
2) Steel grade: SS400 S235jr S355jr ASTM A53 GR.B, GR.A ASTM A106 GR.B...
3) Specification:
Outer diameter: 20-610mm
Wall thickness: 0.5-12mm
Length: 4-14m
Detail picture of steel tube profiles, please check photo
2. Other terms for steel tube profiles
Trade terms: FOB CFR CIF.
Payment: T/T & L/C at sight,DP, papal, cash, O/A, etc
Delivery time: 7-15days after receiving the deposit.
Packing: In bundles, Damp cloth packing, in bulk.
Additional about delivery of steel tube profiles
20ft container Max length 5850mm, Weight 25-27 tons
40ft container Max length 12000mm, Weight 25-27 tons
Bulk vessel MOQ 50 tons.
3. Our Services
1) Samples: free
2) Lenght: any length can be cut for you.
3) Quality: accept THE THIRD PARTY INSPECTION.
4) OEM: Acceptable
5) Marking: company logo, company name, specification can painted on pipes.
6) OC documents can be offered.
Process of steel tube profiles
Ends: threaded with coupler and caps, bevel, groove, plain, etc
Surface: galvanized coating, black painting, 3PE coating, etc
Keywords: steel tube profiles
4. Company Profile
Tianjin Reliance Company , is specialized in manufacturing steel tube profiles. and many special service can be done for you.
such as ends threatment, surface finihsed, with fittings, loading all kinds of sizes'goods in container together, and so on.
Welcome to visit our steel tube profiles.
Our office is located in Nankai distric, Tianjin city, near beijing, the capital of China, and with excellent location.
It just takes 2 hours from beijing international airport to our company by high speed rail.
and the goods can be deliveryed from our factory to tinajin port for 2 hours. you can take
40 minutes from our office to tianjin beihai international airport by subway.
Exhibition of steel tube profiles in India.
5. Production process of steel tube profiles
Above photo is production process of steel tube profiles. It is including welding, cutting, inspection, packing, etc.
6. Factory testing of steel tube profiles
With advanced machine, We can check chemical component, mechanical property, water pressure, etc
Regular inspection: diameter, wall thickness, length, welding range, surface, etc
Above photo is steel tube profiles checking.
7. Customners all of the world
With more than 10 years export experience, the clients come from all over the world.
Main market: Middle East, Asian, Africa, Australia, USA, etc
Welcome to visit us, choose our steel tube profiles.
Customer Visit our factory, visit our steel tube profiles
RFQ
1.Are you factory or trading company?
We are factory, and two company branch company in tianjin city .
2.What is the MQO?
1Ton for nomal size.
3.What is the warry ?
We can deal on alibaba, that is , you pay it on alibaba, i send you goods, and when you get the documents, i can get the payment.
4. Could you do it according to the drawings?
Yes, including the ends treatments, and surface treatments.
Be free to send inquiry, best offer will be sent fast.
Products name: Steel strip packing for steel tube profiles
Keywords: steel tube profiles