china 3pe steel pipe welded
USD $385 - $450 /Ton
Min.Order:1 Ton
Cangzhou Zhongshun Steel Pipe Trade Co., Ltd.
DIN 30670 3PE coated anti-corrosion steel pipe, API 5L
Pipe has three layer PE antisepsis structure:
the first layer with epoxy powder (FBE> 100um),
the second layer with adhesive (AD), 170 ~ 250um,
the third layer with polyethylene (PE) 2.5 ~ 3.7mm.
Integration of them and solid steel pipe make form a good coating.
Diameter range 60mm-1420mm, wall thickness 2.5-18mm, which is a good anti-corrosion method, generally can improve the service life of 50 years, not only extended the replacement cycle of the underground plumbing, and significant cost savings for the provides a strong role in nation-building.
3PE anti-corrosion is the most commonly used method of anti-corrosion, in addition to 2PE, 2PP, 3PP, their manufacturing process is similar to but different raw materials, this anti-corrosion characteristics of the simple fabrication process, the preservative effect, inexpensive pipe manufacturing industry generally agree that corrosion.
3PE anticorrosive steel pipe characteristics:
1. very high tightness,which can greatly save energy, reduce costs, protect the environment in long-term operation.
2, strong corrosion resistance, the construction side simply speed, the service life can be up to 30-50 years.
3, with good resistance to corrosion and impact resistance, low water absorption, the PE (less than 0.01%) at low temperatures.
4, high strength epoxy, PE absorbent and hot melt adhesive softness, etc., have high corrosion reliability.
Usage:
Oil and gas transportation pipeline, Water and other fluid pipeline, Mineral slurry pipeline
Standard:
Seamless carbon steel pipe API 5L Gr.B
Material: ASTM A106 gr.b / API 5L Gr.B
Outdiameter:1/8-48"
Wall thickness:sch40/sch80/sch std
commodity
DIN 30670 3PE coated anti-corrosion steel pipe, API 5L
Standard ANSI,ASTM A192/A179/A106/A53/A500,ASME SA192/SA179/SA106/SA53/SA500 ,API.DIN,GB.JIS
material A106 Gr A/B/API 5L Gr.B
OD 1/8"-48",10mm-1219mm
WT SCH5,SCH10,SCH20,SCH40,SCH60,SCH80,SCH100,SCH120,SCH160,XXS
Usage Structure Use, water transport, Building, Machinery, Traffic, Aviation, Oil development and so on
Other test HY,ET according to request
Length 2-12m Random,5.8M FIXED,6M FIXED,9M FIXED
Surface Black paint as rusty protect, capped ends
Marks As per customers' requirement (Hard marking or spray marking)
Packing In bundles of max 3 tons each, tied in 6 points with steel wire, each with two slings at the ends for lifting during loading and discharging operations.
Shipment In bundles, shipped in 20 or 40 feet containers, break bulk vessel acc to QTY and discharge port
Ends 2"below plain ends,2" above beveled ends, threaded ends available
Method 140mm below cold drawn,140mm above hot rolled,273mm above hot expand
Wall Thickness of seamless carbon steel pipe
SCH5s/SCH10s/SCH10/SCH20/SCH30/SCH40/SCH60/SCH80/SCH100/SCH120/SCH140/SCH160/STD/XS/XXS
Standard export packing:
in Bundles, covered with plastic woven bag, strapped by steel strip,Plastic caps at ends.
Marking:
As per customer's requests.
Painting:
Varnish coating or as the client's request
Passed the ISO9001:2008 quality system authentication and ROHS authentication.
Passed the ISO9001:2008 quality system authentication and ROHS authentication.
Passed the ISO9001:2008 quality system authentication and ROHS authentication.
Our Workshop
Our Warehouse
Our Team
Packing Details : Packing, solid bicycle saddle, 50pcs/carton
Delivery Details : 3-30 days after order of Solid bicycle tire tubes
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons.
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons.
Best stainless steel wing nut anchor bolt for construction fastener bags+cartons+pallets according to customer ' s requirement,Best stainless steel wing nut anchor bolt for construction fastener bags+cartons.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: