Product Details

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

Standard
Grade
Thickness 2.5, 4.0
Section Shape Round
Outer Diameter 48 - 48.3 mm
Place of Origin Tianjin, China
Secondary Or Not Non-secondary
Application Structure Pipe
Technique ERW
Certification CE
Surface Treatment Galvanized
Special Pipe Thick Wall Pipe
Alloy Or Not Non-alloy

Product Features

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube 

Specification
Description Scaffolding Pipe/Scaffold Tube
TechniqueERW
Surface Treatment bare/ painting(varnished)/ galvanized
Outside DiameterOD48mm/48.3mm/1.5inch
Wall Thickness                  2.5mm, 2.75mm, 3.0mm, 3.2mm, 3.75mm, 4.0mm       
Length5.8m,6m,6.4m; 19/20/21feet
Quality guarantee     accept the third party testing
Applicationall kinds of scaffolding products, building materials
Delivery Timewithin 20 days after receiving the deposit or L/C  
Port of LoadingTianjin, China

 

 

Detailed Images

 Scaffolding Pipe Showing

Surface treatment: Bare,Painting,Varnished,hot dip galvanize.

 

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

 carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

 

Sample and Label Showing

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

Our Warehouse

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

Production Process

 

Hot Dip Galvanized Steel Pipe

 

Zinc Coating: average 230gsm, strong anti-rust

 

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

 

Packaging & Shipping

 

Standard Packing: in bundles with steel strip

Our professional loading can protect goods damaged.

When you place order, our factory will produce your goods at the first time.

Prompt delivery can make you win market advantage.

 

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

 

Factory

 carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

Tianjin Ruijie Steel Pipe Co.,Ltd  was established in 2005 and located in China famous steel pipe base - Daqiuzhuang . It attached to Ruijie Group which has fixed assets of 225 million dollars. Ruijie group company is the modernized large group company integrated steel pipe manufacture, anticorrosion & insulation, thermal company and international trade.

 

We mainly offer kinds of steel pipes,steel coils,steel sheets,scaffolding and nails. If you have any interest on other steel products, we would like to support you.

 

Application

 carbon steel pipe production line,cold drawn for construction bs1139 scaffolding tube

 

 

FAQ

Q: Are you trading company or manufacturer ?
A: A: We are factory.

Q2. What is your terms of payment?
A: We can accept T/T,L/C,Alibaba trade assurance order

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF

Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.

Q6. What is your sample policy?
A: we could offer the sample for free charge but do not pay the cost of freight.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now