Factory Cold Drawn 316l Stainless Steel Capillary Tub
USD $1,200 - $3,100 /Ton
Min.Order:1 Ton
01. Material | Steel Grade | 201/202/304/316/316L/430 /439 |
Material Type | Available in cold rolled and hot rolled | |
02. Diameter of Stainless Pipe | W.T | 0.5mm-40mm |
Diameter | 1/8″ thru 24″ | |
Length | 2m-12m, or customer required | |
03. 300 Series Stainless Steel Grades | 304 – 304/L – 304H – 309/S – 309H – 310/S – 310H – 316L – 317L – 321 – 321H – 347 – 347H | |
04. 400 Series Stainless Steel Grades | 410 | |
05. Application | Construction, machine structure, agriculture equipment, water and gas pipes etc. | |
06. Packing | Standard export packing | |
07. Delivery Time | 1.10days after receving the deposit of T/T 2.10days after receving the L/C original | |
08. Trade Terms | FOB, CFR, CIF etc. | |
09. Payment Terms | 1.30%T/T in advance, the balance against the B/L copy 2.30%T/T in advance, the balance against the L/C at sight | |
10. Loading Port | Shanghai,Ningbo | |
11.Company Inform. | Name | Saky Steel CO., LTD |
Type | Manufacture | |
Supply Ability | 20,000 tons per year |
Grade | C (Max) | Mn (Max) | P (Max) | S (Max) | Si (Max) | Cr | Ni | Mo | Nitrogen (Max) | Cu/ Others |
201 | 0.15 | 5.50-7.50 | 0.06 | 0.03 | 1 | 16.00-18.00 | 3.50-5.50 | - | 0.25 | |
202 | 0.15 | 7.50-10.00 | 0.06 | 0.03 | 1 | 17.00-19.00 | 4.00-6.00 | - | 0.25 | |
301 | 0.15 | 2 | 0.045 | 0.03 | 1 | 16.00 - 18.00 | 6.00 - 8.00 | - | 0.1 | - |
304 | 0.08 | 2 | 0.045 | 0.03 | 1 | 18.00 - 20.00 | 8.00- 10.50 | - | 0.1 | - |
304L | 0.03 | 2 | 0.045 | 0.03 | 1 | 18.00 - 20.00 | 8.00- 12.00 | - | 0.1 | - |
310S | 0.08 | 2 | 0.045 | 0.03 | 1.5 | 24.00- 26.00 | 19.00-22.00 | - | - | - |
316 | 0.08 | 2 | 0.045 | 0.03 | 1 | 16.00 - 18.00 | 10.00- 14.00 | 2.00 - 3.00 | 0.1 | - |
316L | 0.03 | 2 | 0.045 | 0.03 | 1 | 16.00 - 18.00 | 10.00- 14.00 | 2.00 - 3.00 | 0.1 | - |
316Ti | 0.08 | 2 | 0.045 | 0.03 | 1 | 16.00 - 18.00 | 10.00- 14.00 | 2.00 - 3.00 | 0.1 | Ti5x C Min |
317 | 0.08 | 2 | 0.045 | 0.03 | 0.75 | 18.00 - 20.00 | 11.00 - 14.00 | 3.00 - 4.00 | 0.1 | - |
317L | 0.03 | 2 | 0.045 | 0.03 | 0.75 | 18.00 - 20.00 | 11.00 - 15.00 | 3.00 - 4.00 | 0.1 | - |
321 | 0.08 | 2 | 0.045 | 0.03 | 0.75 | 17.00 - 19.00 | 9.00 - 12.00 | - | 0.1 | Ti5xC Min |
Standard export packing or as customer's requirement
7-14 working days after confirming order,detail delivery date should be decided according to
production season and order quantity.