Product Details

ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

Place of Origin Shandong, China
Brand Name New BPM welder
Model Number Welding machine
Voltage 220V
Power 800W, 800w and 1800w
Frequency 50Hz
Welding Area as required
Dimensions L32 x W15cm x H22cm
Weight 4.8kg, 5kg
Usage welding geomembrane
After-sales Service Provided Engineers available to service machinery overseas

Product Features

 

  welding ultrasonic geomembrane welding wedge welder

 

 Welding machine introduction>>>

 

Geo-membrane welding machine is our new developed products, which can weld geo-membrane of various

thickness and are applicable for welding of all thermal-fused material such as LDPE, PVC, HDPE, EVA, PP

and so on.

 

 

ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

 

 

Weding processing>>>

 

ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

 

1. Technical parameters>>>

Voltage (V): 220V

Frequency (Hz): 50Hz

Power (P): 800W

Welding speed (V): 0.8-6m/min

Heating temperature (T): 0-450°C

Thickness of material to be welded: 0.2mm-2.0mm

Overlap width: 100mm

Welding width: 12.5mm×2, interior cavity 12mm

Seam strength: ≥85% base material (tensile resistant in shear direction), complete machine

Dimensions: L32 x W15cm x H22cm

Net Weight: 4.8kg

Gross Weight: 8.5kg

Insulation class: class II

.

2. Main Components>>>

 

 

     ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

 

ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

3.Operation principle>>>

 

Motor drives upper and lower pressure rollers to rotate through reduction gearbox and chain. Slide carriages

drive the hot wedge and insert it between the two base materials, at the same time lever presses pressure rollers

 and engages the two fused base materials.

 

Pressure roller

Spring strip

Hot wedge

Run direction

Lower membrane

Upper membrane

Fig.4 Welding schematic diagram

 

 

4. Replacement of components>>>

 

1). Replacement of hot wedge assembly

 

Remove the front end covering, remove the 4-M4 screws and tapping screw, remove a half housing, release 4-M3

screws, remove the 2-M5 screws that connect heating support and slide carriage, remove hot wedge and replace

with a new one, and reassemble the complete machine (shown as fig.6). Note: conform to color on wiring.

 

(Refer to fig.10 and text information)

Front end coving

4-M5 installation screws

Tapping screw

4-M3 turnbuckle screws

4-M4 screws

Fig.6

 

2). Replacement of control box

 

 

8- M3 turn buckle screws

Rear base of control box

Fig.7

3). Replacement of motor

Remove all screws on housing, remove front end covering to remove housing, remove the 4-M5 installation screws on

 the support, remove the main chain guard and separate the upper and lower support. Remove the covering on the

bottom of upper support and weld connection between motor and fuse holder, screw off the 2-M5 installation screws of

the motor, take off motor and replace a new one. Weld back the removed wires and reassemble on the opposite sequence

 (Note: keep upper and lower pressure roller is parallel during assembling.).

 

 

4) Replacing of upper and lower pressure roller

 

Remove the chain guard, take off the forcing off screws on the two chain wheels and then remove chain wheel and chain.

For upper rubber wheel, it can be removed if the two screws on bearing housing that on both sides of press plate are removed.

 For lower rubber wheel, it can be removed if the bearing on one side of chain wheel. Reassemble them in the same method.

 

 

5. General troubles and eliminations>>>

 

Motor not run

Power off

Check that the mains is in On condition

Fuse damaged

Replace fuse

Speed control circuit board damaged

Replace speed control circuit board or control box assembly

Motor burned

Replace motor

Motor speed can’t be regulated

Speed control knob is loosened

Tighten speed control knob

Power tube disruption

Replace power tube or control box assembly

Hot wedge do not heat

Tubular electric heating element damaged

Replace hot wedge assembly

Thermocouple failure

Replace thermocouple

Temperature control knob loosened

Tighten temperature control knob

Temperature control circuit board damaged

Replace temperature control circuit board or control box assembly

Hot wedge is burned red

Thermocouple failure

Replace thermocouple

Controlled silicon disruption

Replace controlled silicon or control box assembly

Chain jumping

There may be sand or small stones on chain and gear

Remove sand or small stones

 

6. Maintenance>>>

 

The complete machine should be cleaned, greased and placed in a dry place if it is not used. For PVC welding, the adhesions

 on hot wedge should be cleaned off if it is not used longer than 4 hours to prevent wedge corrosion and service life being

shortened.

 

******Want to know how to make an order to us?

 

                      Contact Katherine

 

 

The Best Project Material Co.,Ltd

   

P. +86 182 6538 0933   E. katherine(at)hdpetgm.com 

W.www.hdpetgm.com         skype: jialutong-c  

 

ultrasonic geomembrane welding wedge welder for 0.2mm-1.5mm

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now