Product Details

Xinrong dust free knife cutter HDPE pipe extruder machine with PLC control system

Product Features

Product Description

PE PP Pipe Extrusion Machine

Main Technical Features

1. PE pipe extrusion lineis developed by XinRong based on European advanced technology and R&D experience of the plastic machinery for many years. Advanced design, reasonable structure, high reliability, high degree automation of the complete line.
2. Extruder with special barrel feeding structure can largely improve extrusion capacity.
3. Accurate temperature control, good plasticization, stable operation.
4. The complete line adopts PLC control system, realizing synchronization and automation.
5. Human-computer interface is easy to operate, convenient and reliable.
6. Spiral and lattice basket type die head for choice.
7.Dust-free knife cutter and saw cutter for choice.
8.Changing some parts of the line can also realize two-layer and multi-layer co-extrusion.
9.Changing some parts of the line can also produce PP, PB pipes.


Model
Pipe range(mm)
Haul-off speed(m/min)
Total Length(m)
0utput capacity(kg/h)
total power(kw)
PE63
16-63
1.2-12
35
80~120
110
PE110
20-110
1.0-10
38
150~250
163
PE160
50-160
0.8-8
40
200~250
169
PE250
75-250
0.38-3.8
42
250~350
214
PE315
90-315
0.3-3
44
300~350
245
PE450
110-450
0.2-2.0
56
350~450
356
PE630
250-630
0.1-1.0
62
700~800
563
PE800
315-800
0.07-0.7
68
900~1100
740
PE1000
400-1000
0.06-0.6
70
1000~1100
800
PE1200
500-1200
0.05-0.5
72
1000~1300
927
PE1600
710-1600
0.04-0.4
74
1200~1500
1069
Detailed Images

Single Screw Extruder

Advanced overall design of direct combination. Efficient screw and spiral water cooling sleeve in barrel, can realize extruding material in low melt temperature in high speed.
Relation between capacity and screw rotation speed is nearly linear, stable extrusion, high reliability, easy for operation.

Extrusion Die Head

Die head structure: Spiral type , Ensure melt temperature uniformity, thoroughly eliminate confluence seam and reduce flaws such as bubble, black spot, unsmooth inside wall, caused by too high temperature.
Material: 40Cr, forgings with tempering treatment
Bolt grade: 12.9 grade high strength bolt

Vacuum Tank

Vacuum tank is used to shape and cool pipe, so as to reach standard pipe size. Its shape is advanced foreign multilateral anti-deformation structure. The cover is made of high quality casting aluminum alloy.

Its inside is double-chamber structure. The pipeline adopts the design of double loop pipeline, realizing non-stop pipeline clean and function of temperature control.

Cooling Tank

Supporter structure are similar with foreign advanced machine and convenient to observe spray effect.

Caterpillar Haul-off Machine

Its structure with sliding tempering glass door is beautiful and practical. Traction device with V type rubber block caterpillar and controlled by imported inverter can steadily haul pipe. It also features compact structure and free-maintenance.

Adopt special automobile drive shaft to transmit power, stable and reliable. Length measuring device equipped with a rotary encoder, can ensure precise cutting, customer can set the cutting length.

Cutter

Its structure is beautiful and practical with glass window glass. Cutting process is conrolled by PLC, can realize accurately arbitary length cutting.

Stacker

Company
Why choose us?

1. Quality

We have more than 23 years manufacturing experience with more than 800 sets machine lines sold to worldwide. We have our own CNC center to produce machine parts. And control the machine quality from the order confirm to engineers discuss & design, machine processing, testing and delivery. We are one of the Top10 manufacturers for this business in China.

2. Price

Machine price determines your end product cost. Our machine price can make you earn back equipment investment in 2-3 months. We do not sell the cheapest machine, just good quality at good price.

3. Service

We provide turnkey project and completely pre-sales and after-sales service, including project feasibility analysis, installation, commissioning and training.
commissioning and training.
Certifications
Installation Instructions
Arrangement for inspection, installation and testing work
1. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply,water supply, raw material,labors and cranes, etc.
2.We will prepare the visa for our engineers, who are responsible for guiding of machine installation and testing at the factory.
3.The buyer should bear the round-trip air ticket for engineer if visa application is approved. The buyer is also responsible tobear expenses generated according to local conditions, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.
4.Engineer will give free training lessons to labors in buyer’s factory.
Packing & Delivery
Trade terms
1.Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
2.Delivery Time: 40 days after receipt of prepayment.
3.Packing Method: Packing film or wooden case
4.Guaranteed Time: 12 months

MACHINERUNNING TEST AND AFTER SERVICE
1.When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine isok, then client pay for the balance. And inspect machine load the container.
2.When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine
installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
3.If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24hours.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now