Features of Plastic single screw extruder
Main Technical Parameter | |||||
Model | Screw diameter(mm) | L/D | Heating& Cooling zone | Total installed power(kw | Max. Output (15Mpa~22Mpa)(kg/h) |
DS30-25 | 30 | 1:25 | 2/2 | 5 | 2 |
DS40-25 | 40 | 1:25 | 3/3 | 15 | 4 |
DS45-25 | 45 | 1:25 | 3/3 | 24 | 25 |
DS45-30 | 45 | 1:30 | 4/4 | 25 | 40 |
DS45-34 | 45 | 1:34 | 4/4 | 30 | 80 |
DS50-32 | 50 | 1:32 | 4/4 | 44 | 180 |
DS65-25 | 65 | 1:25 | 4/4 | 46 | 80 |
DS65-28 | 65 | 1:28 | 4/4 | 53 | 100 |
DS65-30 | 65 | 1:30 | 4/4 | 62 | 120 |
DS65-34 | 65 | 1:34 | 4/4 | 100 | 290 |
DS65-35 | 65 | 1:35 | 4/4 | 116 | 340 |
DS80-34 | 80 | 1:34 | 5/5 | 150 | 420 |
DS80-35 | 80 | 1:35 | 5/5 | 172 | 540 |
DS100-34 | 100 | 1:34 | 5/5 | 238 | 760 |
DS120-33 | 120 | 1:33 | 6/6 | 328 | 1000 |
DS150-34 | 150 | 1:34 | 6/6 | 460 | 1250 |
DS150-35 | 150 | 1:35 | 8/8 | 258 | 600 |
DS170-35 | 170 | 1:35 | 8/8 | 353 | 700 |
Packaging | Standard sea-worthy package mainly with wood pallets& film and some parts in plywood. |
1 | Customize Design: Special design for every customer’s actual needs |
2 | Guarantee of quality: One year guarantee of quality for line under correct operation. |
3 | Documents supply: Mechanical and electrical operation manual, Electrical connection drawing(1)and Operation technique manual(1). |
4 | After-sales service provided: Engineers team available to service machine overseas. |
5 | Machine maintenance: Machine lifelong maintenance while troublesome happens. |
6 | Upgrade: Free production software upgrading production formula, process technology and machine structure improves, etc. |
Payment terms | 30% down payment after signing the contract within 5 workdays, the rest 70% payment after test run in our factory and before shipment. |
Accepting& inspecting in seller's factory | Bring into the agreed time, it is in seller's factory to accept and inspect. The test run will make the pipes under two sides discussion, and promise the machine works in succession for two hours. Other special request, negotiate by two sides. The charge of test materials should be paid by buyer side. |
Installation&test-run in buyer's factory | 1)User should prepare the plant, operators and tools for machine installing, and make the energy available such as water, electricity, materials, work space, labors and so on. 2)Seller send one engineer for direction and supervising the installing, test run and training. The test run will be finished in 15 days if there is other requests please inform in advance. 3)The buyer should pay $100 per day as subsidy for the engineer, and in addition the round airplane tickets, food, hotel fee and insurance of the engineer during the installation and test-run period. |
Documents supply | Mechanical and electrical operation manual(1), Electrical connection drawing(1), And Operation technique manual(1). |
Welcome for your visiting and discuss the details on the technical and process.
The concrete information please write to our sales.
www.deyili.com