Product Details

1000L 4 Layers Extursion Water Storage Tank Blow Molding Machine

Brand Name YANKANG
Place of Origin China
Model Number YK1000L 4 Layers
Certification SGS,CE,ISO9001
After-sales Service Provided Engineers available to service machinery overseas
Warranty 1 Year
Weight 36 Ton
Dimension(L*W*H) 9*12*5.2m
Condition New
Automatic Yes
Blow Moulding Type Extrusion Blow Moulding

Product Features


The 1000L water tank blow molding machine can be used to produce water tank from 300L to 1000L in 1-6 layers.

Using a more energy-efficient IKV screw, the blow molding machine’s plasticizing ability is 1.5 times faster than similar products.According to customer needs and site conditions, the use of private customized models to create tailor-made products for customers.

Excellent quality, perfect service, and high cost performance make our blow molding machine win the trust and support of our customers.



Latest Technology

1.FOAM LAYER :Foam layer as a new innovation which can increase the wall thickness.

2.INDUCTION HERTERS:Induction heaters for die head and extruder can save 40-50% energy.

3.SERVO MOTOR:Servo motor for clamping system which can save 40% energy.

4.REMOTE SERVICE:It is easier to check the machine operating conditions including cycle time and output. In addition, it is easy to check the machine fault and judge the machine problem.


More advantages about our blow molding machine:http://www.yankangmachine.com/technology-advantages/

Leading International Technology

water tank blow molding machine configuration

Multi-layers Die Head Technology

First,multi-layer mold design makes the wall thickness uniform and stable. Second,it can increase production efficiency by 5 times. Finally,the utilization rate of recycled materials increased by 4 times.

multi-layers die head technology

Output For Each Capacity


The 1000L water tank blow molding machine can produce 300L to 1000L water tanks.


Customer Service

TRAINNING
The buyer could dispatch their operators to the seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the buyer, the seller’s technician could train the buyer’s operators in the buyer’s factory in the periods of installing & adjusting;

INSTALLATION & ADJUSTMENT
The seller could dispatch an engineer against the requests of the buyer to install and adjust the machines for one week(free of charge) in the buyer’s factory. After one week,if the buyer still needs the training,$100 should be paid for the engineer.
The buyer should make a reservation in advance before delivery of the machines;
The buyer should pay for the engineer’s food & board while installation in buyer’s factory.And the buyer should also pay for the air ticket for the engineer.

GUARANTEE 
The guarantee time is one year after the machines normally works in the buyer’s factory, if only the problem is cause due to quality control or any reason by the seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.


You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now