Product Details

PA11 Nylon Pipe Extruder Production Line

Condition New
Type Pipe Production Line
Pipe Material Other, PA
Application Energy Supply Pipe
Production Capacity 240kg/h
Place of Origin Shandong, China
Brand Name DEYILI
Model Number SJPAG-20
Voltage 380V
Power(W) 30kw
Dimension(L*W*H) 15*4*4m
Weight 15tons
Certification CE ISO
Warranty 1 year
After-sales Service Provided Engineers available to service machinery overseas

Product Features

 The features of PA11 Nylon Pipe Extruder Production Line:

 PA11 Nylon Pipe Extruder Production Line

Product Description

 

The production line is in good structure, high efficiency, adopt special screw. The production process is

stably and easy to control. The cutting unit is advanced and make the pipes in good shape. The nylon pipes

are widely used in the field of automobile brake oil pipe, meter pipe, power supply pipes for its high density,

aging resistance and anti-high temperature.


Main technical parameter:

Model: SJPAG-20  
Screw: 50/25
Diameter: 5-20mm
Output: 10-40kg
Power: 30kw  
Speed: 5-30m/h

 

Packaging & Shipping

Packaging

Standard sea-worthy package mainly with wooden pallet and film coverage for the main machine body; wooden cases for electrical parts & consumable parts. In 1 40' containers.

 

 

Our Services

 1

Customize Design: Special design for every customers actual needs 

 2

Guarantee of qualityOne year guarantee of quality for line under correct operation.

 3

Documents supplyMechanical and electrical operation manual, Electrical connection 

drawing(1)and Operation technique manual(1).

 4

After-sales service provided: Engineers team available to service machine overseas.

 5

Machine maintenance: Machine lifelong maintenance while troublesome happens.

6

Upgrade: Free production software upgrading production formula, process technology and 

machine structure improves, etc.

 

Company Information

Located in International Airport Industrial Zone, Qingdao Deyili Plastic Machinery Co., Ltd. A hi-tech 

enterprise specialized in researching, developing, and manufacturing plastic extrusion equipment. It was 

entitled Enterprise of New Technology&Materials of Ministry of Construction, Qingdao Top Ten Hi-

tech Enterprise, and Experimental Unit of Technology Venture Capital. 


We are mainly exporting to Russia, Turkey, Iran, Ukraine, 
Uzbekistan, Finland, Sweden, Austrilia,  and

other area of East Europe and mid-east.

Since foundation in 1998, Deyili has been persevering in technology innovation and devoted to 
R&D and

applications of new machinery, new technology and new technique. We have an excellent technical team 

and keeps close cooperation with many technology institute and universities. 

At present, Deyili owns 28 National Patents, 14 items supplied domestic gap and 6 items are National 

Key Products. We take the lead in development and updating of our key products, which reached the

highest technical level in China. 


Deyili passed certifications of ISO9001 and CE. According to criteria of modern enterprises, 
we are 

making great efforts to carry out effective management from production, supply, quality, technique, to 

services. Deyili has won wide recognition from domestic and overseas customers by high quality 

products and service. 

After years of exploration, the enterprise has been enlarged and strengthened continuously. Now 
it has 

become a group which widened its businesses from one fold plastic machinery to production of plastic 

pipes and pipe-fittings. Deyili can provide more integrated solutions and all-around services to customers 

from extrusion lines to technique and materials. 

Our Factory

PA11 Nylon Pipe Extruder Production Line 

FAQ

Payment terms

30% down payment after signing the contract within 5 workdays, 

the rest 70% payment after test run in our factory and before shipment.

Accepting& inspecting

 in seller's factory

Bring into the agreed time, it is in seller's factory to accept and inspect.

The test run will make the pipes under two sides discussion, and

promise the machine works in succession for two hours. 

Other special request, negotiate by two sides. 

The charge of test materials should be paid by buyer side.

Installation&test-run

in buyer's factory

1)User should prepare the plant, operators and tools for machine

installing, and make the energy available such as water, electricity,

materials, work space, labors and so on.

2)Seller send one engineer for direction and supervising the

installing, test run and training. The test run will be finished in 15 days 

if there is other requests please inform in advance.

3)The buyer should pay $100 per day as subsidy for the engineer, and

in addition the round airplane tickets, food, hotel fee and insurance of

the engineer during the installation and test-run period.

Documents supply

Mechanical and electrical operation manual(1), 

Electrical connection drawing(1),

And Operation technique manual(1).

 

Welcome for your visiting and discuss the details on the technical and process.

The concrete information please write to our sales.

 

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now