Product Details

Three nozzle head Plasma surface polishing plasma system for folder gluer machine

Place of Origin Jiangsu, China
Brand Name IB
Model Number IB-B1B

Product Features

Specifications

Better bond after plasma polishing in UV, PP film
Less gluer to reduce cost
More environmental without normal polishing

Three nozzle head Plasma surface polishing plasma system for folder gluer machine

 

System Configuration:

u   Paired-pulse high-frequency occurrence of the second inverter system

u   PLC automatic control of man-machine interface

u   Can be run in accordance with the automatic speed adjustment to achieve power

u   To set the speed and power to match the scope of work pressure nozzle, automatic restart

u   Low speed protection value

u   180-260V wide-range regulators, air pressure automatic adjustment of PID control

u   A variety of fault detection alarm, multi-level password protection

u   Assembly of imported parts, cost-effective

 

Advantage of plasma technology of the foloder gluer mchian:

♥     Surface tension of materials can be increased after plasma treatment to enhance bonding strength of cartons and improve product quality.

♥     Cold glue or ordinary low grade adhesive can be used to substitute hot melt adhesive, and less quantity of glue is needed, thus effectively reduce production cost.

♥     With plasma technology adopted, materials that are hard to bond such as UV and PP film can be filmly nonded with water based glue, thus eliminating the mechanical grinding and perforation process. No dust of scrap is produced during processing, so the process meets safety and hygienic requirements for drugs and roodsturr as well as for environment protection.

 

Technic Data:

 

ModelIB-1BIB-2DIB-3T
Input power supply

AC2200V (±20%)

AC2200V (±20%)AC2200V (±20%)
Output power1000VA1000VA * 21000VA * 3
Output frequency20-23KHz20-23KHz20-23KHz
Air supply pressure2-3bar2-3bar2-3bar
Main machine size400*320*740MM530*450*1050MM680*530*1450MM
Shower nozzle amountone nozzledouble nozzlethree nozzle
Processing width8-20MM8-20MM * 28-20MM * 3
Weight32KGS36KGS40KGS

 

 

 

INSTALLATION:

 

Installation of the machine will be done by our engineers (one mechanical and one electrical). Installation and training is free of charge and the whole period is 7 working days. Extended training will be charged USD200 per person per day.

 

Customer is also responsible for the expenses of return air tickets, hotel accommodation (3 star hotel), meals and local transportation for engineers. If a translator is required, it will be on customer’s account.

 

WARRANTY

 

There is 1 year warranty (from the date of installation) on all parts, mechanical and electrical, due to defect in manufacturing, except for consumable parts such as belts, rubber sucker, etc and if “accident” or mal-operation has occurred.

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now