Product Details

Customized Matt Nickel Chrome Black Copper Coated Bronze Seamless Iron Round Tubing 10mm 16mm 19mm 25mm 2\" Diameter Steel Pipe

Product Features

Product Description
Standard
Grade
C max
Mn max
Si max
P
S
Yield strength MIN 
Tensile strength MIN
Elongation%
ASTM A572M
50
0.23
1.60
0.50
0.04
0.05
345
380
21
GB/T8162
Q345B
0.22
1.0-1.60
0.40
0.04
0.03
345
375
21-26
ASTM A36
A36
0.24
-
0.40
0.045
0.030
250
400-520
26
Width:  cut to customized
Cutting large coils into steel strips but directly cutting into large diameter coil strip, also can cut to small coil strip,
Descriptions
Grades
Structural pipe
20# 35# 45# Q345B, 16Mn, Q345B-E, 20Mn2, 25Mn, 30Mn2, 40Mn2, 45Mn2

SAE1018, SAE1020, SAE1518, SAE1045.
Liquid pipe
20# q295b-e, q345b-e
High pressure boiler tube
20G 15MnG 20MnG 15CrMoG, 12Cr1MoVG
St35.8, sa106b, sa106c, sa210a, sa210c, A333P2, A333P11, A33P12, A333P22, A33P36, A333P91, A333P92, A335T2, A335T11, A335T12, A335T22, A335T91, A335T23, A335T9
Pipeline 
API SPEC 5L, X42, X52, X60, X65,X70,X80
ASTMA53, ASTM A106, ASTM A333, BS301, BS3602, BS3603, BS3604, PSL1, PSL2, DNV-OS-F101, CSA-Z245
Alloy pipe
4140, 42CrMo, 32CrMo, 15CrMo,
Packing
Black paint, Varnish painting, Tarpaulin packing
End
Common round end, beveled.
Processing
Galvanizing; cutting; making thread outside the pipe; Machining.
Detailed Images

Why choose us

NO.1 Good Quality


NO.2 Reasonable Price

NO.3 Fast Delivery

NO.4 Professional Service
Material
ST37,ST52, 20#. 1020, SAE1518, Q345B 20G, 45CrMo, 30CrMo etc.
Dimension
Out Diameter:10-600mm
Thickness: 1mm-200mm.
Length: 1m - 12m
Delivery time
stock size 5-10 days, special size 15-25 days.
Payment term
30% TT or LC at sight
Packing & Delivery

Packing

1. by bundles, each bundle weight under 3 tons, for small outer diameter seamless steel pipe, each bundle with 4 - 8 steel strips.

2. after making by bundle, covered with Polyethylene waterproof cloth.

3. make black paints painting on each pipe, then make bundles


Our Service

we can cut the seamless steel pipe into the length you demand, and can make the surface to be bright by milling and grinding at the Lathe, and can grind the outer diameter and wall thickness to be the dimension you demand.If the sizes are not available from the standard common stock sizes, and the quantity are not enough for the new production, then we need process the stock larger seamless pipes into the sizes you need. And we also can make steel pipes deep processing. For example, size OD250x ID200 is not stock common size, then need using larger pipe to process into 250x 200, same as OD170xID100

Factory show
About us

Mainly provides steel plate, steel sheet, steel pipe,seamless steel pipe and tube, round bars and steel section, and doing steel products processing service: steel plate and sheet processing service. The processing works concludes cutting the larger plate into the small sizes customer demand, cut by drawing, cut to special sizes, weld the cut parts by drawing, also make galvanizing processing or surface painting on the final processed parts; steel pipe hollow bar cutting and lathe processing to make the outer diameter and wall thickness to meet customers requirement, also make heat treatment for hollow bars and pipes. Tianjin Emerson Commercial and Trade Co.,Ltd has large stocks for the carbon steel and low alloy steel plates and sheets, especially have the thick plate and heavy plates on stock, also can provide the special material and large size steel plates, boiler and pressure vessel steel plate, marine steel plate, hot rolled steel plate for new production. Tianjin Emerson Commercial and Trade Co.,Ltd also has large stock for hollow bars, thick wall seamless pipes and tubes. Tianjin Emerson Commercial and Trade Co.,Ltd can provide good service for customer, good quality products, fast delivery, and after-sale service, Tianjin Emerson hopes to build good cooperation with everyone interested.

FAQ

1.How long can make delivery?

For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.

2. Will the Test Certificate be certified to EN10204 3.1?

For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.

3. Once the received products found not comply with the products the contract demands, what will you do?

Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.

BACK TO HOME

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now