Product Details

Peeled / Turned DIN 1.2357 Cold Work Tool Steel 10mm / 20mm Steel Round Bar

Brand Name NFCase
Place of Origin China
Model Number AIA-1

Product Features

Delivery Time:3-5 days
Certification:CE,FCC,MSDS

DIN 1.2357 Cold Work Tool Steel Round Bar for Forming Die , Punch , Blanking Die , Shear

Steel Grade:

1.2357

Application:

Tool Steel, Mold Steel

Shape:

Round bar

Standard:

AISI, DIN, JIS, GB

Dimension:

Φ10 – 600 mm

Surface:

Black, Peeled, Turned, Grinded

Technique:

Hot rolled, Forged

Ultrasonic Test:

100% UT Passed

Description:

◆ Equivalence

AISI / SAE

DIN / W.Nr

JIS

GB

S7

1.2357

----

----

◆ Chemical Composition (%)

C

Si

Mn

P

S

Cr

Mo

V

0.45

0.55

0.20

0.50

0.50

0.80

0.030

0.030

3.00

3.60

1.20

1.60

0.05

0.25

◆ Dimensions

Hot Rolled

Forged

Diameter (mm)

10-130

60-600

Length (mm)

2000-5800

2000-5800

◆ Delivery Condition

EAF+LF+VD+(ESR), Hot rolled or Forged, Annealed, Hardness≤225HB, Black surface

or Machined surface (Peeled, Turned, Grinded), UT 100% Passed

◆ Characteristics

1. It is a shock resisting tool steel with excellent toughness and high strength, along

    with medium wear resistance.

2. It has maximum shock resistance and high compression strength, which gives it

    good deformation resistance in use, while retaining good toughness.

3. Easy to machine in the annealed condition and can be readily heat treated, can be    

    quenched in air, exhibiting minimal distortion on hardening.

◆ Applications

Typical applications for S7 tool steel are punches, chisels, blanking dies, forming dies,

cold and warm header dies, shears, compression dies, hobbed dies, high hardness

plastic molds, zinc die casting dies, gripper dies, etc.

◆ Heat Treatment

Annealing

710 to 750°C

Slow controlled cooling in furnace at a rate of 10 to 20°C/hr down to approx. 600°C,

further cooling in air.

Hardness after annealing: max. 225 HB.

Stress relieving

Approx. 650°C

Slow cooling in furnace; intended to relieve stresses set up by extensive machining, or

in complex shapes.

After through heating, hold in neutral atmosphere for 1-2 hours.

Hardening

870 to 900°C / Oil

Holding time after temperature equalization: 15 to 30 minutes.

Obtainable hardness: 58 - 62 HRC

Tempering

Slow heating to tempering temperature immediately after hardening/time in furnace

1hour for each 20 mm of work piece thickness, but at least 2 hours/cooling in air.

For average hardness figures to be obtained, please refer to the tempering chart.

For certain cases we recommend to reduce tempering temperature and in crease

holding time.

What we can offer?

We offer a wide range of steel products in a wide variety of dimensions and executions,

acc.to the common international specifications or customerized.

Machining and heat treatment are available.

Also, we advise you in choosing the right materials.

-- 50,000 tons Stock

-- 7 warehouses and branches

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now