Product Details

High Quality Gypsum Board Production Line Equipment

Product Features

High Quality Gypsum Board Production Line Equipment

Introduction of the Equipment
 

Gypsum board production line based configuration table
Annual production(㎡)Plant area(㎡)Drying methodTotal installed capacityProductin linespeed
(m/min)
Requird workersElectrical configuration
1.5 million60m×26mThermal oil116kw3.08Siemens
2million70m×26mThermal oil127kw4.210Siemens
3million84m×30mThermal oil166kw6.2511Siemens
4million110m×30mThermaloil/Hot stove210kw811Siemens
5million112m×30mThermaloil/Hot stove234kw10.511Siemens
6million122m×30mThermaloil/Hot stove240kw12.511Siemens
8million136m×30mThermaloil/Hot stove349kw16.511Siemens
10million150m×30mThermaloil/Hot stove467kw2012Siemens
12million172m×30mThermaloil/Hot stove488kw2413Siemens
15million204m×36mThermaloil/Hot stove578kw3115Siemens
20million240m×40mThermaloil/Hot stove778kw4015Siemens
Product specifications: length 2400—3000mm width 1200—1220mm thickness 8—15mm







Gypsum board production line is the current production of new special equipment for decorative materials, the main work processes include:

1. The plaster and water and various additives, respectively, by automatic metering, automatic delivery system into the mixer, mixing into a gypsum slurry, and evenly sprinkled in the continuous forward movement of the face paper;

2. In the continuous forward while vibrating, the slurry gradually spread evenly, then into the extrusion molding machine and the upper and lower face paper complex, by the extrusion molding pulp is completely covered by the upper and lower skin paper, and extruded into Continuous slurry gypsum board;

3. The board in the molding line during the operation after shaping, natural solidification, automatic cutting, etc. have been gradually formed wet solid gypsum board, wet board by the program-controlled system, through the roller, belt conveyor and flap quickly into the drying room;

4. The board in the drying room under the strict control of each temperature zone, and into the hot air at different temperatures, wet plate evaporation, starch reaction and the board bonded to the protective paper, dried gypsum board from the drying room stand out;

5. And then flap again and pieces (front-facing), the length of the saw will cut the board into a certain size of the finished board;

6. The final delivery to automatic head and automatic stacking, palletizing completed by the forklift truck to the finished product warehouse.
 


Annual output: 1.5 million square meters / year -3000 square meters / year

1. Reasonable design, perfect matching, reliable operation;

2. My company has: less investment, fast construction, low operating costs, cost-effective advantages;

3. Set the production line design, manufacture, installation, commissioning, production in one, created a number of elite teams;

4. Customer success, customer development for business purposes, long-term cooperation for a better future for the idea.


Service items:

1. My company has a professional installation team, home installation and commissioning, until the production of qualified products so far;

2. Long-term supply of spare parts, equipment warranty for one year

3. Responsible for long-term technical advice and technical services, ready to solve a variety of technical problems

4. Charge d'affaires shipment and the relevant import and export procedures.

The progress of the project construction, project approval, process layout, civil construction, equipment selection, production and installation, production commissioning, trial production stage, the entire process can be completed in 3 to 5 months.


You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now