Product Details

water bottle cap mould

Place of Origin Zhejiang, China
Brand Name R&D
Model Number R&D
Shaping Mode Plastic Injection Mould
Product Material Steel
Product Household Product

Product Features

Specifications

bottle cap mould
1.cold or hot runner
2. short cycle time
3.With valve gate system
4.good quality ,competitive price

plastic bottle cap mould 

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

Following information is essential for your better understanding on our moulds  

namePlastic Bottle Cap Mould
mould  material718 2738 P20 S136 etc
cavitysingle/mulit
runnerhot / cold
mould  design3D/2D
design days3-5 days
mould  life300.000-3.000.000
plastic materialPE PC PS PP ABS PVC ect
injection systempin-point gate
payment40% of deposit by L/C T/T 60% of balance  by L/C T/T
delivery time30-50 days
specificationdepends on customers' demand

 

CAP MOULD FEATURES:
1. Adopt special cap mould treatment technology, key parts using corrosion resisting mirror steel, surface hardness can reach HRC60°
2. Mould material adopts imported P20, 2316 etc mould steel.
3. Hot runner is designed advanced and reasonably, each cavity heat controlled independently, which makes the temperature uniform.
4. Germany HOTSET or Italy ROTFIL hot runner.
5. Each cavity and core has independent cooling system, which can shorten production period.
6. Mould can be self knockout, reduce labor cost.
7. The mould cavity can be changed, which is convenient to change remark of the cap.
8. Mould lifetime can be guaranteed with 2 million mould times.

  

Business Step 
1. R& DWe support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design 3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery Delivery goods by sea or by air, according  customers requirement 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now