Product Details

Plastic Injection petri dish mould

Place of Origin Zhejiang, China
Brand Name ENA
Model Number ENA-0656
Shaping Mode Plastic Injection Mould
Product Material Steel
Product Household Product

Product Features

Specifications

petri dish mould
1.Mold base:45#
Core/cavity:S136/718H/P20
2.Runner type: YUDO hot runner
3.Delivery time: 50day

     ENA mould is specializing in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’ on alibaba carefully. You will get a completed view of this company.

petri dish mould

Plastic Injection petri dish mouldPlastic Injection petri dish mouldPlastic Injection petri dish mould

Plastic Injection petri dish mouldPlastic Injection petri dish mouldPlastic Injection petri dish mould

Plastic Injection petri dish mouldPlastic Injection petri dish mould

 

 

 

 

 

 

Detailed description :

Basic mould information:

Runner Type

YUDO Hot Runner

Mould Size

560*530*610mm

Mould Weight

810Kg

No. of Cavity

1 cavity

Product capacity

3.6L bucket

Product Material

ps

Product Weight

146g

Wall thinkness

1.2mm

Surface finish

High polish

Delivery Time

50 days

 

There are three levels of mould quality for your option.

Option A:  Level A quality (Highest Level Quality)

Mould Base: LKM, 45# Steel

Core/Cavity: S136+Becu

Slider/Insert: S136

Mould spare parts: SKD 61

Hot Runner: YUDO

Mould Life: 1,000,000 shots

Cycle Time: 28s

 

Option B: Level B quality (Middle Level Quality)

Mould Base: 45# Steel, self-made

Core/Cavity: 718H

Slider/Insert: 718H

Mould spare parts: China Brand

Hot Runner: China Brand

Mould Life: 800,000 shots

Cycle Time: 30s

 

Option C: Level C quality (Lowest Level Quality)

Mould Base: 45# Steel, self-made

Core/Cavity: P20

Slider/Insert: P20

Mould spare parts: China Brand

Hot Runner: China Brand

Mould Life: 5,000,000 shots

Cycle Time: 32s

 

Attention pls:

Price varies in different quality level. When you send us the mould inquiry, please offer the following information:

1) Quality level you choose: Level A/Level B/Level C

2) Paint Barrel  Photo

3) paint Barrel  capacity

4paint Barrel wall thickness

 

Mold Making Process

 

Processing

Time

Prepare Steel

 7days

Surface Dealing

 3days

Lathe, Crude Machining

 7days

Drill

 4days

Heat Treatment

5days

Lathe, Precision Machining

 8days

Precision CNC

 5days

Polish

 6days

Assembling and Fitting

 3days

T1 mould test

 2days

 

 Total: It is 50 days for first mould testing after mold design is confirmed.

 

 

Mold Quality Control

 

For the Q/C of mould, there are 3 steps:

 

1. Mould Material Q/C

 

   - Mould Steel Checking (Hardness, flaw detection)

 

   - Mould Standard Spare Parts Checking (hardness, size, flaw checking)

 

2. Mould Making Process Q/C

 

   - design checking (part design, mould design, mould engineering drawing)

 

   - Each part of mould’s size checking after machining according to 2D drawing

 

   - mould testing (check mould running condition)

 

3. Check with customer’s requirement again before mould shipping.

 

 

Mold Pack and Shipping

 

Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.

 

Sent together with the mould:

 

a)      Mould manual instruction

 

b)      engineering drawing in flash disk

 

c)      One more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.

Plastic Injection petri dish mouldPlastic Injection petri dish mouldPlastic Injection petri dish mouldPlastic Injection petri dish mould

 

Mold Maintenance

 

a) When the mould is vacant, spray the anti-rust oil

 

b) To clean the gate and cooling system regularly

 

c) Avoid using recycled material if the mould is suitable for virgin material only

 

 

After-Sale Service

 

 a) one-year after-sale technique support

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now