Product Details

Coal mine exploiting tunnel boring development machine

Brand Name HW
Place of Origin Shandong, China
Model Number HW-EBZ 45
Type Coal mine tunnel boring machine
Certification ISO9001
After-sales Service Provided Engineers available to service machinery overseas
Warranty 2 Years
Weight 11.8t
Dimension(L*W*H) 7.5*1.6*1.5m
Power Type Electric
Voltage 380/660V
Usage Coal
Condition New
Power(W) 70KW

Product Features

EBZ series coal mine exploiting tunnel boring development machine machine

 

 

Tunnel boring machine (TBM); According to the operation mode, it is divided into open tunneling machine and shield tunneling machine.

Working mode: mainly consists of walking mechanism, working mechanism, loading mechanism and transfer mechanism. As the walking mechanism advances, the cutting head in the working mechanism breaks rocks and carries them away. It has the advantages of safety, high efficiency and good quality.

 

EBZ cantilever tunneling machine is mainly used in coal roadway, semi-coal roadway and soft rock roadway and tunnel tunneling. High configuration, safe and reliable. Through the second transport plane, it can be matched with dump truck, shuttle truck, belt conveyor, etc. to realize continuous cutting, loading and transportation.

 

1. High configuration, advanced technology, good reliability, low center of gravity and good machine stability; The cutting part is retractable with a retractable stroke of 550mm.

2. The tunnel boring machine has internal and external spray, and the internal spray is the spray behind the teeth, so as to strengthen the external spray and reasonably design the form of external spray. The internal spray has the function of water leakage detection.

3. Large inclination Angle at the bottom of the shovel plate, large ground clearance and strong climbing ability of the whole machine. The motor directly drives the star wheel, which is conducive to loading and bottom cleaning;

4. The horizontal and straight structure of the intermediate transport plane is formed by four-link rod slippage with the shovel plate. When the shovel plate is lifted or horizontal, the length of the scraper chain of the first transport plane changes little;

5. High gantry, smooth transportation, double-chain scraper transport, high-strength wear-resistant steel plate is adopted in the chute to ensure the service life of chute and scraper;

6. The body and rear support are welded with thick plate box structure, with good rigidity and high reliability;

7. The walking drive system is highly integrated with internationally advanced motor and reducer, and the output torque is highly adaptable to the operation of large inclination Angle.

8. The hydraulic system adopts constant power, pressure cutting and load sensitive control;

9. The electric system adopts the new comprehensive protection, with the function of self-diagnosis and memory for the dynamic display of liquid crystal characters.

 

Coal mine exploiting tunnel boring development machine

 

EBZ series coal mine exploiting tunnel boring development machine Parameters

Name

EBZ 120

EBZ 75

EBZ 45

Cutting power

120KW

75KW

45KW

Cutting head speed

42r/min

60r/min

65r/min

Cutting ability

70MPa

50MPa

40MPa

Retracting capacity of cutting mechanism

240mm

550mm

550mm

Walking speed

9m/min

12m/min

12m/min

Climbing ability

±18°

±16°

±18°

Rotational speed of star wheel

30r/min

30r/min

30r/min

Chain speed of scraper

0.85m/s

0.65m/s

0.65m/s

Total installed power

195KW

105KW

70KW

Power supply voltage

1140/660V

1140/660V

380/660V

Maximum heading height

3.75m

3.50m

3.50m

Maximum positioning driving width

5.0m

4.20m

3.80m

Undercover

240mm

300m

350m

Ground specific pressure

0.14Mpa

0.12Mpa

0.12Mpa

Ground gap

250mm

200mm

180mm

Throughput

50-80t/h

20-50t/h

8-20t/h

Machine weight

35t

18.8t

11.8t

Dimension(L*W*H)

8.74*2.8*1.55mm

7.5*1.6*1.5m

7.5*1.6*1.5m

 

EBZ series coal mine exploiting tunnel boring development machine Pictures

Coal mine exploiting tunnel boring development machine

Coal mine exploiting tunnel boring development machine

Coal mine exploiting tunnel boring development machine

Coal mine exploiting tunnel boring development machine

Coal mine exploiting tunnel boring development machine

Contact information2

Any question,please feel free to contact Kavin any time.

Email:hwzg004(AT)zghwzg.com 

Mobile/What's app/Wechat:+8618853717316

QQ: 2851087470

Fax: 0086-537-2585538

Company introduction

Coal mine exploiting tunnel boring development machine

Company culture

Core concept

Green development ,Harmony and win-win.

Quality policy

Reliable navigation ,Specialization,Manufactureof precision,Service sincerity.

Company spirit

Beyond, Create, Share.

Criteria for partners

Frank, Trust, Fairness, Impartiality.

Coal mine exploiting tunnel boring development machine

Certifications

 

Coal mine exploiting tunnel boring development machine

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 KQD150 Air DTH water well bore hole drilling rig DTH portable borehole water well drilling machine rigs

If you have another question, pls feel free to contact us as below:

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now