XY-3 Rotary deep water well drilling rig Introduction
a. XY-3 drilling rig adopts CG140 model auto transmission, has 10 rotation speeds and easonable
speed range, with eight forward roation gears and two reverse rotation gears, high speed, strong
stroke and wide scope of application.
b. Large engine power and two reverse rotation gears, can easily solve the drilling work accident.
c. The operation handles are fixed together in reasonable layout to make it more convenient for
workers to operate the machine.
d. Equipped with normally closed hydraulic chuck, operation is flexible and reliable
e. Spindle and hoist can be operated separately.
f. Spindle has big inner diameter, able to use big hexagonal drilling rod.
XY-3 Rotary deep water well drilling rig Parameters
Unity machine parameter | |
Drilling depth | 600m |
Max open hole caliber | 300mm |
End hole caliber | 75mm |
Drilling Rod diameter | 60mm |
Drilling angle | 90°~65° |
Dimension | 2500 x 900 x 1800mm |
Drill weight (without power) | 1600kg |
Spindle | |
spindle speed | Forward 30-1050r/min |
Reverse 29 137r/min | |
Spindle stroke | 600mm |
Spindle inner diameter | 96mm |
Lifting capacity | 6000kg |
Hoist | |
Max.Single line lifting capacity | 4000kg |
Max.Single line lifting speed | 0.5-1.9m/s |
Wirerope caliber | 12.5mm |
Wirerope length | 50m |
Reel diameter | 300mm |
Hug folldgate belt width | 90mm |
Mud pump | |
Type | BW-250 |
Displacement | 250 L/min |
Work pressure | 80kg/cm² |
Water inlet pipe diameter | 75 mm |
Water outlet pipe diameter | 50 mm |
Gear Oil pump | |
Duplex gear oil pump | CBF-F63/25 |
Front Displacement, pressure | 63 L/min 20Mpa |
Behind Displacement, pressure | 25 L/min 20Mpa |
Power | |
Diesel engine | 4105 76HP |
Electric motor | Y180L-4 59KW |
XY-3 Rotary deep water well drilling rig Real detailed pictures
Details
Drilling pipe:
Any question,please feel free to contact Kavin any time.
Email:hwzg004(AT)zghwzg.com
Mobile/What's app/Wechat:+8618853717316
QQ: 2851087470
Fax: 0086-537-2585538
Related products | ||
XY-3C Crawler well drilling | well drilling machine | XY-44A Core drilling machine |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
KQD150 Air DTH water well bore hole drilling rig DTH portable borehole water well drilling machine rigs
If you have another question, pls feel free to contact us as below: