UK8 8 ton Yunnei engine 4wd wet brake underground off road coal mining dumper truck
Basic Specification of UK8 Underground mining mine site dumper | ||
Bucket capacity | 3.5m3 | |
Rated load | 8000kg | |
Operating weight | 6200kg | |
Grade ability | 25º | |
Min turning radius outside | 5500mm | |
wheel tread/wheel base | 2000mm/1580mm | |
Bucket size | 3400X1980X780MM | |
Overall dimension | 5480X1950X1950MM | |
Engine | ||
Model | YCD4J22G | |
Type | in linedirect injectionwater cooler4 cylinders | |
Rated power | 85kw | |
Max torque | 2400r/min | |
Transmission system | ||
Torque converter | Fixed shaft Power . shift hydraulic torque converter transmission | |
Nos of shifts | forward 4 reverse 2 | |
Max speed | 24km/hr | |
Rear and front axle | 4×4,front axle fixed, rear axle swing(+/-110) | |
Steering | ||
Type | hydraulic steering | |
Steering angle | 35 degrees on both sides | |
Hydraulic system | ||
Pressure | 16MPA | |
Brake type | Drum brake | |
Tyre | ||
Size | 20.5-20 Solid tyre | |
Fuel capacity | ||
Fuel tank | 100L | |
Hydraulic oil tank | 80L |
1.How can I place order? A: You can contact us by email about your order details, or place order on line.
2.How can I pay you? A:After you confirm our PI, we will request you to pay. T/T or start order from Alibaba trade assurance
3. Are you factory supplier?
A: Yes, we are real factory supplier for over10years, own a super technical team to serve adjusting design for customers
A: Yes, we are real factory supplier for over10years, own a super technical team to serve adjusting design for customers
4.How many tons site dumper do you produce ?
A:We are specilized in producing site dumper cover 1ton to 10tons. Model:FCY10, FCY20, FCY30, FCY50, FCY70, FCY100.
5. Which brand engine do you have for site dumpers? A:We company choose good quality engine for site
dumpers, Changchai, Xichai, Weichai Power engine / cummins engine/ Deutz diesel engine and so on optional.
dumpers, Changchai, Xichai, Weichai Power engine / cummins engine/ Deutz diesel engine and so on optional.
6. What's the order procedure?
A: First we discuss order details, production details by email or TM.Then we issue you a PI for your confirmation.You
will be requested to do prepaid full payment or deposit before we go into production.After we get the deposit, we start to process the order.We usually need 7-15 days if we don't have the items in stock.Before production has been finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you. More details please ask us online or send inquiry to us,we will answer first time.
will be requested to do prepaid full payment or deposit before we go into production.After we get the deposit, we start to process the order.We usually need 7-15 days if we don't have the items in stock.Before production has been finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you. More details please ask us online or send inquiry to us,we will answer first time.