Product Details

100-277V 120w led flood kit 347v

LED Light Source SMD chip
Input Voltage(V) 110V-277V
Lamp Power(W) 120
Lamp Luminous Flux(lm) 15600
Lamp Luminous Efficiency(lm/w) 130
Color Temperature(CCT) Cool White
Working Temperature(℃) -40, 45
Working Lifetime(Hour) 50000
Lamp Body Material Aluminum
IP Rating IP44
Certification CE, EMC, ETL
Warranty(Year) 5
Place of Origin Guangdong, China
Brand Name Bbier
Model Number BB-SDD-120WD1

Product Features

100-277V 120w led flood kit 347v

 

Technology of   led shoebox  kit : for LED canopy ight

ModelInput PowerCertificationInput VoltageCCTCRILumensPower FactorInstallation
BB-SDD-60WD1

60W

         ETL DLC pending100-277V 50/60HZ

WW(3000k),

NW(4100k),CW(5000K)

>80 7800 lm±5% >0.95Screw
BB-SDD-80WD180W 9600 lm±5%
BB-SDD-100WD1100W 13000 lm±5%
BB-SDD-120WD1120W 15600 lm ±5%
BB-SDD-150WD1150W18000lm±5%
BB-SDD-200WD1200W28800 lm±5%
BB-SDD-300WD1300W39000 lm ±5%

 

l ed
Feature:
  • High power SMD chip 
  • Normally 100-277VAC ,accept 347V,480V
  • Mogul base or medium base
  • UL TUV approved meanwell driver 7year warranty quality guarantee
  • Temperature sensor design to protect the lamp
  • Ajustable stained steelness Pole to meet different height installation
  • Pure aluminum fins heat sink for very good ventilation ,temperature below 45degree
Advantage for  led shoebox kit ?

1. Energy saving, environmental friendly, No UV or IR radiation

2. Anti-shock, anti-moisture, no glare, no strobe light, protecting your eyes

3. Imported light source, high brightness

4. Instant on, no warm up time required

5. High intensity and stability, no maintenance cost

6. Easy installation, can be installed in ceilings, walls and other places.

7.IESNA full cut-off dark skies friendly

 

 Production show:

100-277V 120w led flood kit 347v100-277V 120w led flood kit 347v

100-277V 120w led flood kit 347v

100-277V 120w led flood kit 347v

Application picture show:

Area/shoebox street light

Wall pack/post top light

Scottsdale canopy light/garage light

High bay/low bay light

Flood light/pole light

 100-277V 120w led flood kit 347v

 

 

Packaging info:
ItemsPackaging unitDimensionN.WVolume weight
60w-150w12pcs/Box685*575*350mm21.6kg31.0kg
200w-300w3pcs/Box510*365*365mm7.5kg18.0kg

 

Delivery info:

   led replacement metal halide  e39

Delivery time: 1-2 days for samples, 15-20 days for bulk order.

Payment ways: Paypal, TT, western union.

Delivery ways: DHL, UPS, FEDEX, TNT, Air, Sea.

Our services:

 

1)Any inquiry about our products and price will be replied within 24 hours.

2)Professional sales team with fluorent oral english and well-trained products knowleage.

3)OEM service with printed logo on your products and your own designed color box and labels.

4)Professional after-sales service, any quality problem about our products will be resent new products.

 

What is BBier's Trade Terms?

1. Payment: T/T, 100% before delivery (western Union or paypal are welcomed )

2. Sample lead time: 1-3days

3. Production lead time: For 2~10PCS 1- 7days; 100~500PCS 15-28days

4. Shipping freight are delivered under your requests

5. Shipping port: Shenzhen, mainland China

6. Discounts are offered based on order quantities

7. Min Order Quantity:  1-10PCS

8. Logo: According to your requirement

9. Packaging: 12PC /box

10. Shipping: By Express(EMS, DHL, UPS, ARAMEX), By Air or By Sea

Company Information

 

Company info:

 

BBier lighting CO.,LTD is a manufacturer located in shenzhen,guangdong ,china.

 

We are one of led business mogel.And our market niche is USA,Canada,EU,Africa market.

Now we have more than 60 led item passed the DLC,80 ETL item as well.TUV-CE,SAA,CE,Rohs ,ISO9001 certification.Quality is our best commitment to our client.

 

100-277V 120w led flood kit 347v

                                                  &&

FAQ:

 

1.How to order?

Step 1. Inquiry professional quotation to Bbier saler.

Step 2. Confirm the price, lead time, payment term and some specific requirements.

Step 3. BBier saler send the proforma invoice.

Step 4. Customer make the payment for deposit, BBier arrange production.

Step 5. Customer make balance payment before shipping.

Step 6. Order can be say finish when customer receive the goods and satisfy with them.

Step 7. Feedback to BBier about quality, service and suggestion, and we can do better.

2. Can you provide IES/LM79/LM80 report?

Yes. When need, please feel free to contact BBier.

3. Why the 120w LED retrofit kit can be used to replace 400W MH/HPS bulb?

1). LED lightings are directional lighting. The angle is 120deg and they point down directly. However, the MH/HPS bulbs are 360deg, which will lost a lot of light in inside the reflector.

2). The light decay of LED retrofit kits are much slower than HPS/Sodium, which become quite dim after one or two years.

3). Most of our clients are using 80W to replace 250W, and 120W to replace 400W. They are satisfied with our light level.

Why choose BBier lighting?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                       

Contact info:

Contact person:Vicky Zhang

 

Kindly click the "contact" Now!! Then we will know your inquiry and offer the sulotion for you choose,hope help you purchase it in time.

Welcome to Visit Shenzhen BBier lighting Co.,LTD factory!

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now