Product Details

AR111 G53 LED Lamp

LED Light Source COB
Warranty(Years) 2
Input Voltage(V) AC85-265
Lamp Power(W) 9
Lamp Luminous Flux(lm) 630-750lm
Lamp Luminous Efficiency(lm/w) 70
Color Temperature(CCT) Pure White
Working Temperature(℃) -20, 50
Working Lifetime(Hour) 50000
Lamp Body Material Aluminum
Certification CE, SAA
Base Type AR111
Place of Origin Fujian, China
Brand Name XMJUMP
Model Number XMJUMP-AR111

Product Features

AR111 G53 LED Lamp 

 

 

Specification

01  Specification

 

 

 Product name LED Spot Light AR111  Power 9W
 Model No. XMJUMP-AR111  LED CHIP COB
 Body Material Aluminum  Input Voltage AC85-265V
 Dimention  D62*H110mm  Luminous Flux       630-750lm
  Warranty  
  2 years  CRI 75

 Color Temperature

 2700-6000K  Beam Angle 30°
 Color Warm White/ Natural White/Cool White  Certificate
 CE, RoHS
 Working Temp. -20℃ ~ +50℃  Lifespan  30000-50000hrs

 

AR111 G53 LED Lamp

 

Application

02  Application

LED Spot Light AR111 are widely used as illumination and decorations in hotel, hall, chamber, villa and other slap-up locations. It can also be applied for indoor places such as store revelation, showcase, restaurant , revelation hall, art hall ,office,reading room, groggery,and so on.

 

 

AR111 G53 LED Lamp

 

Product Details

03  Product Details

AR111 G53 LED Lamp

 

 

  

Packaging & Shipping

04  Payment & Shipping

 

AR111 G53 LED Lamp

 

 

AR111 G53 LED Lamp

 

 

Quality Control

05   Quality Control

AR111 G53 LED Lamp

 

 

Certifications

06   Certifications

 

AR111 G53 LED Lamp

 

 

 

Our Services

07  Our Services

 

 Our service:

1. Reply to your inquiry in 24 working hours.

2 .Experienced staffs answer your requirement promptly.

3 .OEM&ODM and customized design are available.

4. Exclusive and unique solution can be provided to our customer by our professional engineers.

5. Good quality and good service be supplied to you.

 


Trade Terms:

1. Payment: For Sample : By T/T or Western Union or Paypal.

                    For mass production: T/T 30% deposit and 70% balance before shipment.

2. Lead time: 5~15 working days, subject to the order quantity.

3. Delivery ways: DHL, UPS door to door service, by sea, by air, etc.

4. Package:As our normal packing or your design requirement.

 

 

 

AR111 G53 LED Lamp

 

 

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now