Product Details

Commerical barking waffle cone maker egg tart shell mini tartlets machine

Product Features

Product Description

Commerical barking waffle cone maker egg tart shell mini tartlets machine 


Product Feature

1.Non stick surface.Temperature range: 50-300 degree.
2.Energy-saving, thermostat control & timer control.
3.Stainless steel body, with high conductivity, quick heating, more energy-efficient.
4.Good Flavor foods can be made. In the condition of high pressure and temperature, foods can be fried more evenly and sufficiently.
5.The upper and lower module plates are enameled and are easy to be cleaned.
6.One-headed and double-headed baker can be chosen freely.
7.Independent temperature controlling system are convenient to handle and can achieve energy economy as well.
8.Internal temperature protector is reliable and safe.

Basic Parameters
Name
Digital Tartlets Machine
Model
NP-844
Material
Stainless steel 304
Dimensios
440*520*430mm
N./G.Weight
32/34kg
Volts
220v/110v 50Hz
Power
3.2kw
Food size
110*60*19mm
Packing size
660*520*490mm
Related Product
Our Company
Certificate
Our Customers
Customer Review
FAQ



1.Q: What Is Your Minimum Order Quantity(MOQ)?

A: We are a manufacturer and generally do wholesales. However, trial oders are also acceptable and welcome!



2.Q: How Can I Pay For My Order?

A: (1).Teleraphic Transfer(T/T): We accept 30% T/T deposit before production and 70% T/T balance before shipment. 100% payment before prduction for sample orders.
(2).Western Union(W/U): We accept 100% payment via the Western Union.
(3).Also can be pay on alibaba.



3.Q: What Are The Shipping Costs?

A: (1).Shipping cost is based on number of packages, gross weight of those packages, total package volume and destination port.
(2).We will package your goods in the strong export standard cases, your order will be shipped via the most economical carrier, unless you specify otherwise.



4.Q: How About The Delivery Time?

A: (1).Some of the products are in stock at our warehouse is European plug, generally we need 1~3 days to change the plugs and package them before the delivery.
(2).Regarding to the non-stock products, the lead time is 15-30 days depends on your requirements and quantity.
(3).We will suggest you the fastest shipping methods when you need the products urgently.



5.Q: Can you help us to make our products?

A: Yes sure we can, our company OEM is warm welcome! Our company have 10 year's experience in making kitchen equipment, we are the professional kitchen equipment factory in Guangzhou.


You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now