S361 Two Way Concealed hinge
Item No | S361 two way hinge |
Type | Full overlay, Half overlay, Inset |
Usage | Furniture/Cabinet/ Wardrobe |
Feature | Two way, Slide on |
Cycle test | 50000 times |
Material | Stainless steel |
Angel of opening | 110 degree |
Cup diameter | 35mm |
Depth | 11.5mm |
Hole pitch | 48mm |
Base plate | 2 hole or 4 hole |
Panel size | 3-8mm |
Door thickness | 14-21mm |
Real photo for ref. |
Packing&Shipping
Packing
2pcs/polybag, then 200pcs/ctn, 200pcs/ctn or as customer's requirement
Shipping
30 days after the advanced payment
Company Information
We have sophisticated production equipment and the sophisticated production
technologies .
The high quality products of our company are evaluated approval by the certification of ISO9001:2000.
We have many advanced testing equipments including pull tester,etc to controproducts quality and meet customers’ demands. All our products with SGS,UL product certification approval
We are using the new automatic plating line, it's the enviromental one.And now the hinge pass 48 hours salt spray testing rather than 24 hours
Our service
Certification | SGS,ISO9001:2000 |
Packing: | each in polybag,20pcs in a inner box; 200pcs/carton |
Delivery date: | around 30~45 days base on order quantity |
MOQ | 5000pcs(XINGPENG BRAND) |
Supply Ability | 100000pcs/month |
Payment Term: | T/T; L/C or others |
Samples offer | XingPeng will offer free samples base on reasonable quantity for quality inspection |
samples arrangement: | Samples wil be prepare to seding in about 3 working days DHL/Fedex: will be around 4~6 days to reach destination |
Problem confirmation
Tiny problem: | Please provide the proof to photo or video to us. we will reply in two days time |
Serious problem: | |
A | WE WILL DISPATCH OUR QUALITY AND PROBLEM APPRAISERS TO MAKE A CONFIRMATION |
B | HAVE A NEGOTIATION OF THE COMPENSATION AND SIGN AGREEMENTS |
C | OUR AFTER SALES DEPARTMENT WILL PERFORM THE DUTIES AS THE AGREEMENTS |
FAQ
Q:XingPeng is trading company or factory?
A: xingpeng is factory and establish since 1997
Q:How to get there?(when you are in GuangZhou)
A: 1) take a bus in GuangYuan station; 5 hours by bus and we will pick you up in station
2) take train(high speed) will take about 3 hours arrive in chaoshan station. And we will pick you up in station.
3) take fly from baiyun air port to chanshan air port. This will takes about 1 hours. And we will pick you up in air port
Q:Why customer choose us?
A: 1) Service
2) Quanlity control
3) Reasonable price
4) Shipment delivery time
Q:XingPeng do the plating outside or has own plating line?
A:XingPeng own private plating line. And will do better in new plating city after Jun.30,2015
Q: XingPeng only doing export business or also domestic business?
A: Xingpeng Make both.
Q:Can you do my products or logo?
A:XINGPENG:Yes,we can do your brand and your design.
More information will be showing here or if you have any questions, please send us email!Thank you !!
Contact
GuangDong XingPeng Industrail Co,ltd
Contact:Lynn
Tel:86-663-8730688
Skype:gdxingpeng-lynn
QQ:2851279118