Turbo Charger TA5101 Turbocharger 466074-5011S 466074-0011 466074-0001 3526963 312389 468996 470387 863501 5002778 turbo for Volvo Penta F12/ N12/NL12
Truck TD121F USA TD121G diesel engine kits
Product Discription
20% DISCOUNT FOR THE INQUIRY!
Part Number | 466074-5011S |
Previous Version | 466074-0011, 466074-0001, 3526963, 312389 |
OE number | 468996, 470387, 863501, 5002778 |
Description | Truck F12, N12/NL12 |
CHRA | 441398-0026 (441398-5026S) |
Turbo Model | TA5101 |
Engine | TD120G/GA/121G, TD120G, TD121G, TD120GA |
Displacement | 11.98L, 11950 ccm, 6 Cylinders |
KW | 298/400 |
Angle α (compressor housing) | 180° |
Angle β (turbine housing) | 360° |
Bearing housing | 410310-0001 (311548)(432351-0021, 479802-0002) |
Turbine Wheel | 441194-0001 (314407)(431126-0001, 431126-0002, 432620-0002, 435257-0001, 435257-0002, 435737-0005, 435922-0001)(Ind. 88.9 mm, Exd. 77.7 mm, Trm 76, 11 Blades) |
Comp. Wheel | 441792-0007 (312595)(431350-0001, 431350-0007, 431350-0015)(Ind. 64.25 mm, Exd. 91.00 mm, Trm 50, 6+6 Blades, Superback) |
Back plate | 442752-0002 (430612-0003, 432280-0001)(199646) $22.80 NEW IN STOCK |
Heat Shield | 410366-0004 (197394)(431055-0001, 431055-0003, 410366-0003, 410366-0007) |
Repair Kit | 709143-0001 (200423-0000, 707903-0002)(1100025761) |
Turbine Housing | 441184-0004 (311820) |
Compressor Cover | 443209-0127 (312392) |
Turbine Housing AR | 1.34 |
Gasket (turbine inlet) | 132040 (202873, 205396, 205396, 3500683, 210017-0000, 409038-0000, 1S4295, 9749)(1900000003) |
Gasket (turbine inlet) | 210239 (Stainless Steel) |
Gasket oil inlet | 129119 (201049, 9737, 1S6595, 210019-0000, 409266-0003, 3819900)(1900000035) |
Gasket (oil outlet) | 210060 (409267-0003, 409267-0002, 210060-0000, 51914, 148062, 311585, 2475013) |
Applications
for 1984- Volvo/Volvo-Penta F12/ N12/NL12 Truck with TD121F USA, TD121G Engine
Product Display
Material Discription
Related Products
Factory Profile
- Our factory was founded in 1948, the first turbocharger factory in China we have 1200 types of turbochargers from 70-200KW of various automobiles, ships, engineering machinery and diesel generator, gas engine pressure requirements;
- We are the qualified supplier of CUMMINS, BOSCH,KAMAZ, we can provide the turbo same as the OEM quality;
- We passed ISO9001 /IATF16949 CCS Quality certifications;
- We have the Precision casting foundry can produce customized high quality precision casting items with competitive factory price;
- Our annual capacity 100 thousands pieces, and we provide MOQ 1PC order service and 12 months warranty.
Factory Facilities>>
Annual Machining Capacity :100,000 Pieces
Precision Casting Workshop Divided Into:
- Model processing workshop
- Smelting casting workshop
- Cleaning workshop
Testing Equipment>>
Testing the spare parts by using the three-coordinate measuring machine(CMM),
optical imaging instrument, roundness and cylindrical instrument.
Our Factory History>>
Quality Certifications
After more than 40 years of continious efforts, our company has obtained more and more widely recongnition in autoparts industry.
- In 2002: Product Certification from CCS(China Classification Society)
- In 2002: Passed ISO9001 Quality System Certification
- In 2009: Passed IATF16949 Quality Certification
Exhibition Show
Every Time We Will Participate in Various International Auto Parts Exhibitions:
- HANNOVER MESSE(Hannover Industrial Fair, Germany)
- MANUFACTURING EXPO THAILAND
- AUTOMECHANIKA FRANKFURT(Frankfurt International AutoParts Exhibition)
- AAPEX(Las Vegas International Auto Parts and After-sales Service Exhibition)
- MIMS(Russia International Auto Parts Exhibition)
- Automechanika Shanghai
Our Brand Product Catalog
Payment and Transportation
FAQ
Q1. Where is your company?
A: We are located in Fengcheng City Erlongshan Industrial Park, Liaoning Province, China(Mainland)
Q2. What is your terms of packing?
A: Generally, we pack our goods in plastic bags and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. T/T , L/C ,Credit Card , Western Union all ok .We’ll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q5. How about your delivery time?
A: Generally, it will take 5 to 7 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, the customer pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q9: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers’ benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.