Product Details

Hydropower project

Place of Origin Hunan, China
Brand Name HNAC
Model Number 50-2000KW
Type Plant
Electricity Generator Type Hydro Power

Product Features

Hydropower project

 

HNAC Technology Co., Ltd. was established in 1993, which is located in Changsha National High-tech Industrial Development Zone of Hunan, China. HNAC has been dedicated to provide the products and technical services for hydropower stations since its establishment. The main products include turbine, generator, electrical equipments, protection automatic and control system, and technical services like consultation, investigation, design, installation, maintenance and technical training are also provided.

HNAC is the world unique R&D and Manufacturing Base of Small and Medium Hydropower Control Equipments under UNIDO ICSHP. With the rich experiences in small and medium hydropower construction, HNAC have provided products and services to 33 countries over 6000 hydropower plants (installed capacity range from 10kW to 50MW) all over the world. HNAC takes the largest market share in the small and medium hydropower in China.

“Your success is the success of HNAC”, is the business philosophy HNAC always adheres to. We are committed to making users believe that to choose HNAC is to choose value.

 

HNAC Hydropower Plant/EPC Contracting/Turnkey Project 

We aim to hand in hand with our worldwide client in converting the water potential into profitable and environmentally-friendly sources of energy. HNAC has rich experience in offering complete customized solutions to generate electricity.

 

Hydropower project

Hydropower project

 

2) Myanmar YAZAGYO Hydropower Plant

Located in north of Kalay District, Sagaing Division of Myanmar

Rated head: 33.6m

Installed capacity: 2*2MW (horizontal Axial-flow turbine)

The project is scheduled to complete in Mar, 2016

Hydropower project

3) Pakistan Foundation Hydel Power Plant (FHPP) 3/4

The project is invested by Pakistan Atomic Energy Commission Foundation.

Design head: 13m; Design flow: 46m3 /s

Installed capacity: 2*2.5MW (vertical Axial-flow turbine)

The project is scheduled to complete in Oct, 2015

Hydropower project

4) Vietnam Ha Song Pha 1 & Ha Song Pha 2 Hydropower Project

Located in Ninh Son District, Ninh Thuan, southeast of Vietnam

Design head: 22m; &20.8m

Design flow: 14m3 /s & 14.5m3 /s

Installed capacity: 2*2.7MW (vertical Francis turbine) &  2*2.5MW (vertical Francis tur bine)

The project was completed in Nov. 2014 and July, 2015 respectively.

Hydropower project

Hydropower project

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now