FCY50 4WD 5Ton Dumper Truck hydraulic concrete mini dumper
Specification
Payload | 5000kg | |
Operating weight | 3250 kg/ FCY50S is 3750 kgs | |
Hopper capacity | 2.0m3 | |
Maximum speed | 25.2 km/h | |
Handbrake available on grade | 18% | |
Max grade ability | 25% | |
Distance of road after brake | ≤2.5m with load and speed 10km/h | |
Minimum turn radius | 4 m | |
Ground clearance | 248 mm | |
Noise level | ≤108 db(A) | |
Loading discharge angle | 48.4 | |
Time of discharge | 6s | |
Hydraulic pressure | 16 Mpa | |
Wheel base | 2200 mm | |
Engine power | 47KW | |
Wheel tread | 1580 mm | |
Dimensions (LxWxH) | 4400x2100x2700 mm | |
Engine | ||
Model/Maker | 4102 | |
Type | Diesel 4 stroke engine, 4-cylinder incline, direct fuel injection, water cooled | |
Bore x stroke piston | 100 x 102 mm | |
Power | 47KW | |
Speed | 2400 R/Min | |
Max t | 120@2100v/p | |
Weight | 350 kg | |
Transmission system | ||
Hydraulic Torque Converter | 2 Forward and 2 reverse gears | |
Type | power shift, spur gear constantly in mesh | |
Model | 265 | |
Type | 3-elements.single stage | |
Torque ratio | 3.06 | |
System pressure | 160(kgf/c㎡) |
1.How can I place order?1.How can I place order?
A: You can contact us by email about your order details, or place order on line.
2.How can I pay you? A: After you confirm our PI, we will request you to pay. T/T or start order from Alibaba trade assurance
3.Are you factory supplier?
A: Yes, we are real factory supplier for over10years, own a super technical team to serve adjusting
design for customers
design for customers
4.How many tons site dumper do you produce ?
A:We are specilized in producing site dumper cover 1ton to 10tons. Model:FCY10, FCY20, FCY30, FCY50, FCY70, FCY100.
5. Which brand engine do you have for site dumpers?
A:We company choose good quality engine for site dumpers, Changchai, Xichai, Weichai Power engine / cummins engine/ Deutz diesel engine and so on optional.
6. What's the order procedure? A: First we discuss order details, production details by email or TM.Then we issue you a PI for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production.After we get the deposit, we start to process the order.We usually need 7-15 days if we don't have the items in stock.Before production has been
finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you. More details please ask us online or send inquiry to us,we will answer first time.
finished,we will contact you for shipment details, and the balance payment.After payment has been settled, we start to prepare the shipment for you. More details please ask us online or send inquiry to us,we will answer first time.