80 series gray color simple design aluminum sliding window/casement
Aluminum Profile thickness | 1.4mm,1.6mm and 2.0mm |
Glass option | Single glass: 6mm/8mm/10mm Double glass: 5mm+6A/9A+5mm. Laminated glass: 5mm+0.76PVB+5mm Lowe coating glass. Frosted glass. Australia standard glass, AS2208 certificated. |
Frame Track option: THREE OPTIONS | Type A: 2 track for two glass panel. Frame depth: 80mm wide Type B: 3 track- 2 track for glass panel and 1 track for mosquito net. Frame depth: 190mm. Type C: 3 track with water fringe at 15mm high for water preventing. |
Mosquito net option | stainless steel net & heavy duty burglar proof SS net. |
Hardware | German HOPO braned. |
Aluminum color | White, gray & wood grain color. |
Design | Our designer will make the Shop Drawing for your window size. |
Q1: How can I get the quote? A: Please kindly send your order plan, such as size list, design picture or simple drawings, and aluminum color, then you could receive the recommendation correspondingly and quote shortly.
Q2: How are the windows package to protect the glass?
A: All of our products are packed by following steps:
Step 1. The surface of the profile all covered with protective tapes bubble film.
Step 2. Fix windows and doors in the wooden crate.
With pull of our protection, the goods can arrived in safe and sound.
Q3: What shipping method will adopt?
A: We ship out the door by sea, to the port closest to you. Or using your own agent is acceptable.
Q4: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 30 to 35 days for producing.
Q5. Could I know the Order Process?
A: Provide us size & drawing → Quotation → Price confirmation Shop drawing confirmation →Manufacture → quality control Goods
Q2: How are the windows package to protect the glass?
A: All of our products are packed by following steps:
Step 1. The surface of the profile all covered with protective tapes bubble film.
Step 2. Fix windows and doors in the wooden crate.
With pull of our protection, the goods can arrived in safe and sound.
Q3: What shipping method will adopt?
A: We ship out the door by sea, to the port closest to you. Or using your own agent is acceptable.
Q4: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 30 to 35 days for producing.
Q5. Could I know the Order Process?
A: Provide us size & drawing → Quotation → Price confirmation Shop drawing confirmation →Manufacture → quality control Goods
inspection Goods shipment