Product Details

best price counter-flow cooling tower fill pack High quality 12mm cooling filter

Product Features

Product Description

best price counter-flow cooling tower fill pack/High quality 12mm cooling filter

Cooling tower fill is one of the most important components for exchange of gas and water in cooling tower. The heat and resistance characteristic of the cooling tower fill are the main factors influencing the cooling efficiency. Moreover the quality of the material will influence the fill's lifetime. Our company choose the high quality fill for the cooling tower. Our cooling tower fill is with the advantages of good chemical stability, resistant acid, alkali and organic solvent corrosion, high cooling efficiency, small ventilation resistance, strong hydrophilicity, large contact area etc

Cooling towers reject heat from water-cooled systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.

There are two main configurations of factory assembled cooling towers: crossflow and counterflow. In crossflow cooling towers, the water flows vertically down the fill as air flows horizontally across. In counterflow cooling towers, the water flows vertically down the fill as air flows vertically up.                 

Product Images

                                                                  Welcome to homepage

Product Detail
Item Name
High quality 12mm cooling filter
Size
Width 300/305/600/610mm* Length any
Thickness
0.30mm*0.50mm
Application Temperature
75℃~-35℃
Color
Black
Application
Packing & Delivery
Our Company
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment/ Paypal /Western Union/LC at sight

If you have another question, pls feel free to contact us as below

Contact Information

If you have any need foe cooling tower components, such as cooling tower fill, drift eliminator, mist eliminator, cooling tower spray nozzle and so on, please don't hesitate to contact with us. In here, each pnenny is count and you will get high quality products and good service. We trust, good quality and service are the basic of long term business.

Click here ,contact me.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now