grp hand lay-up cooling box
1. grp hand lay-up cooling box adopts the high quality PVC fill, its peak nested fan lines to enhance cold heat exchange ability, and is worth by high temperature of 60 °C, water cooling effectiveness guarantee as to the best level. At the same time with high temperature resistant type water tower supply, is worth by 60-95 °C high temperature water, especially suitable for electric power industries
2. Fan of grp hand lay-up cooling box: axial flow fan, uses the advanced plastic, or aluminum alloy manufacture, every fan before they leave the factory will have been strictly set from small and balance test.
3. All metal main parts of grp hand lay-up cooling box: the thick body steel manufacturing, the international standard hot galvanized antirust processing, but also provides full stainless steel fittings
4. grp hand lay-up cooling box shell and chassis, are all acid alkali corrosion resistance of glass fiber reinforced plastic senior (FRP), all pipes and water spray equipment adopts advanced plastic, need not add the lubricating oil, ensure durability
1. Reference the operation quality of grp hand lay-up cooling box, and checking the safety coefficient of foundation bearing capacity. |
2. grp hand lay-up cooling box should not be installed on the smoke, heat, open flame. |
3. grp hand lay-up cooling box should not be installed on the presence of corrosive gas. |
4. grp hand lay-up cooling box of the vent and the distance between the obstacles should be more than 3 m. |
5. Circulating water pump suction part should be set below the position of the cooling tower pond water. |
6.grp hand lay-up cooling box should be set pipeline stages, the cooling tower don't directly pipeline under weight. |
7.The function of grp hand lay-up cooling box circulating water related, should check whether the reach regulation |
8. Regularly check grp hand lay-up cooling box water level, water temperature, the motor power, voltage, and cooling tower vibration and noise, etc. |
9.Winter operation of grp hand lay-up cooling box should pay attention to not use ventilation window, easy is covered with ice and snow, cold water circulation,may cause the water system and packing frozen. |
Technical parameters of grp hand lay-up cooling box
Detailed of grp hand lay-up cooling box
Project case of grp hand lay-up cooling box:
Note:
1.T/T ,50% as deposite and the balance to be paid before shipment
2.With one year warranty
3.The machinery will be packed with standard wooden case
4.One unit in one international wooden case
5.Delivery time :About 20 days upon receipt of deposit
Thanks for your attention of our grp hand lay-up cooling box and welcome to visit our website and factory !