10" Small Black Nylon Golf Cooler Bag Insulated Bag Cooler Bag With Aluminum Foil Liner
USD $0.5 - $3.5 /Piece
Min.Order:1000 Pieces
Durable Waxed Canvas Frame Built Lunch Bag With Gray PEVA Liner For Men Quality Choice
High Quality Waxed Canvas Best Lunch Bag With Zipper Closure
High Quality Waxed Canvas Insulated Lunch Bags For Men Quality Choice
Deluxe Black Nylon Foldable Freezable Lunch Bag With Zip Closure Quality Choice
Promotional Cheap Polyester Ice Chest Bag Ice Cooler Bag Wholesale
10" Small Black Nylon Golf Cooler Bag Insulated Bag Cooler Bag With Aluminum Foil Liner
Product Description | ||||
Brand | Linka | Item No | 2CB1 | |
Material | Nylon | Lining | Aluminum Foil | |
Closure | Zipper | Size | 10.5" x 7" x 9.5" | |
Type | Golf Cooler Bag Insulated Bag Cooler Bag | Appliacation | Golf Cooler Bag | |
Logo | Custom | Color | Customized | |
Description
| 10" Small Black Nylon Golf Cooler Bag Insulated Bag Cooler Bag With Aluminum Foil Liner Type:Golf Cooler Bag Insulated Bag Cooler Bag Yiwu Bag Factory Direct Sale Order With Competitive Price Aluminum foil liner compartment, zippered front cover w/pocket,side mesh & velcro pocket, ten tee ring holders on the top, open holder & rear poly-web strap w/plastic snap buckle for golf cart carrier. |
Golf Cooler Bag Insulated Bag Cooler Bag
Packing | 1. 1pcs/opp bag,20-50pcs/carton(Depends on the size of bags) |
2. As customer's request | |
Shipping | 1.By Express(DHL,Fedex,UPS,Aramex,TNT,EMS) takes 4-8days |
2.By Air takes 5-12days | |
3.By Sea takes 25-45days |
1.Q:Are you factory or trading company? |
A: We are 100% factory from China. |
2.Q:Where is your factory located? How can I visit there? |
A:Welcome to Visit us. Our factory is located in Yiwu City, Zhejiang Province, China |
3.Q:How can I get samples? |
A: We are honored to offer you samples. |
4.Q:How does your factory do regarding quality control? |
A:Quality is priority. Linka people always attach great importance to quality controlling from the very beginning to the very end. |
5.Q: How many days for your production turnaround? |
A:Usually 30 days |
6.Q:How can we pay for the order? |
A:T/T(30% Deposit,70% Balance),West Union,Escrow(Alipay),MoneyGram,Paypal |