Product Details

shantui bulldozer part made in china bulldozer final drive gear 175-27-31362

Place of Origin Shandong, China
Brand Name TIMELYSNOW
Model Number 175-27-31362

Product Features

Specifications

- made in china
-12 months guarantee time
-certified by CE and ROHS
-specilized in construction machinery 20 year

 

  

shantui bulldozer part made in china bulldozer final drive gear 175-27-31362 offers all kinds of spare parts with short delivery time and high quality for construction machinery and engine, such as loader; bulldozer;  excavator;  crane;   road roller;   grader;  diesel engine;  marine engine etc..

 

-Engine related spare parts

-Converter, transmission, and piping parts

-Steering case and final drive parts

-Track system

-Work equipment control system

-Electrical system

 

 
Product Description              

 

Product name

gear

Applicable models

SHANTUI bulldozer

Part NO.

175-27-31362

Brand

TIMELYSNOW

Weight

kg/pc

QTY for a set machine

1set

Lead time

1~2 days after order confirmation

After-sales Service Provided

Engineers available to service machinery overseas

 

 

 

 

 

 

 

 

 

 

 

 

Photo

 shantui bulldozer part made in china bulldozer final drive gear 175-27-31362

 

To assure it is the exact part you demand, 

pls advise your machine brand & model, or offer the Part NO. Thank you!

 

we could offer parts for engines and machines of brands below:

 
Packaging & Shipping

Export standard Plywood box packing (water proof,damp proof and mould proof and fumigation-free).

  shantui bulldozer part made in china bulldozer final drive gear 175-27-31362

 
FAQ

shantui bulldozer part made in china bulldozer final drive gear 175-27-31362

 1.Delivery:

    Q: How do deliver the goods? 

    A: by sea/by train/by air, we'll recommend the best way for you depends on goods quantity.

shantui bulldozer part made in china bulldozer final drive gear 175-27-31362

WEIGHTRECOMMENDED TRANSPORT MEANSTRANSPORT TIMECOMMENTS
<50kg

express-UPS/DHL/FEDEX

door to door service

3-7 days

fast

convenient

expensive

50-150kgby air3-10 days

fast;

economic;

consignee has to do customs clearance

150>kgby sea10-50 days

slow;

economic;

it takes some time for customs declarance and clearance

2x20' or 1x40'by rail20-35 days

slow;

economic;

it takes some time for customs declarance and clearance;

only full container load accepted( MOQ:2x20' or 1x40' )

2.Payment

    Q: how to pay us?

    A: Firstly, for small amount, Paypal, WU;Moneygram are recommended. We have no limitation of order quantity, we could send you only one bolt if you demand; just be assured, we won't take your money and say byebye.

     Secondly, for large amount, T/T, E-credit online, L/C are recommended.

     BTW, we offer deferred payment for VIP clients. You could pay us after you receive the goods, or even after you sell out the goods.

 

AMOUNTTRANSPORT MEANSRECOMMENDED PAYMENT WAYCOMMENTS
small amountby express

escrow;

paypal;

western union;

moneygram;

1 days
small amountby airT/T;1-7 days
small amountby express

escrow;

paypal;

western union;

moneygram;

1 days
mediumby air/by sea/by rail

T/T;

L/C;

 
large amountby air/by sea/by rail

E-credit line;

Escrow;

 

VIP: Deferred payment available, welcome to contact us for details.

 3.Warranty

   <1>

    Q:  There are so many suppliers from China, how to identify the quality?

    A:  All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!

    <2>

    Q:  What if parts we order from you are lost during delivery?

    A:  We'll resend the parts!

4.Price

    Q:  Why your price is so high?

    A:  You get what you pay for.

There is no winfall profits at all in such an open market. We just insist resonable profits.

We offer genuine parts and replacement parts as your request, but we WON'T OFFER COPYCATS!

5.Lead time

    Q:  How many days it takes before you deliver the goods to us?

    A:  We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.

6.About us

<1>We have been in construction machinery field since 1991;

<2>Golden supplier of ALIBABA for years

<3>Excellent exhibitor of many famous exhibitions all over the world, CTT2012, ANKOK 2012, EXPO 2011 etc.. 

 

 

7.Good stock

We have large stock of commonly used parts, and we could assure fast delivery.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now