Delivery Time:30-50 days
Certification:ISO9001:2008,BV,GSG, IST, UL,CTI
Open Die Heavy Steel Forgings , 50Mn / 4140 / 60CrMo Forging Roller
Products:
forged roller, alloy steel roller,rolling mill parts, hot roll, cold roll, roller shell, overall roll, metallurgy composite roller, forging white cast iron roll.
Products reference:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Custom properties
|
C | Si | Mn | P | S | Cr | Ni | Mo |
|
50Mn | 0.48-0.56 | 0.17-0.37 | 0.70-1.00 | ≤0.035 | ≤0.035 | ≤0.25 | ≤0.30 | ≤0.25 | |
4140 | 0.38-0.43 | 0.15-0.35 | 0.60-0.90 | ≤0.035 | ≤0.040 | 0.80-1.10 | -- | 0.15-0.25 | - |
60CrMo | 0.55-0.65 | 0.17-0.30 | 0.450-0.80 | ≤0.020 | ≤0.015 | 0.50-0.80 | ≤0.25 | 0.20-0.40 | |
9Cr2Mo | 0.85-0.95 | 0.25-0.45 | 0.20-0.40 | ≤0.025 | ≤0.025 | 1.70-2.10 | ≤0.25 | 0.20-0.40 |
|
|
|
|
|
|
|
|
|
50Mn | Ø10 | ≥645 | ≥390 | ≥13 | ≥40 | V | ≥39 | ≤255HBS |
4140 | Ø10 | 740~1000 | 450~850 | ≥12 | ≥25 | V | ≥40 | ≤250HBS |
Process procedure:
Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Stor